Jilin cogen power station (国电吉林热电厂) is an operating power station of at least 690-megawatts (MW) in 35 Xvzhou Road, Longtan, Jilin, China with multiple units, some of which are not currently operating. It is also known as 吉林龙潭热电厂, Jilin power station, Jilin Longtan power station, 国能吉林热电厂“等容量替换”2×350MW热电联产项目.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Jilin cogen power station | 35 Xvzhou Road, Longtan, Jilin, Jilin, China | 43.899596, 126.570146 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 10, Unit 11, Unit 12, Unit 13, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6, Unit 7, Unit 8, Unit 9, Unit A, Unit B: 43.899596, 126.570146
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| Unit 1 | Retired | coal: unknown[1] | 35 | subcritical | yes | – | 2011 | False |
| Unit 10 | Operating | coal: unknown[1] | 220 | subcritical | yes | 1988 | 2024 (planned) | False |
| Unit 11 | Operating | coal: unknown[1] | 220 | subcritical | yes | 1989 | 2024 (planned) | False |
| Unit 12 | Construction[2] | coal: unknown[1][2] | 350[2] | supercritical[2] | yes[3] | 2026 (planned)[3] | – | False |
| Unit 13 | Construction[2] | coal: unknown[1][2] | 350[2] | supercritical[2] | yes[3] | 2026 (planned)[3] | – | False |
| Unit 2 | Retired | coal: unknown[1] | 35 | subcritical | yes | – | 2011 | False |
| Unit 3 | Retired | coal: unknown[1] | 35 | subcritical | yes | – | 2011 | False |
| Unit 4 | Retired | coal: unknown[1] | 35 | subcritical | yes | – | 2011 | False |
| Unit 5 | Retired | coal: unknown[1] | 65 | subcritical | yes | – | 2011 | False |
| Unit 6 | Retired | coal: unknown[1] | 65 | subcritical | yes | – | 2011 | False |
| Unit 7 | Retired | coal: unknown[1] | 65 | subcritical | yes | 1959 | 2013 | False |
| Unit 8 | Operating | coal: unknown[1] | 125 | subcritical | yes | 2000 | 2024 (planned) | False |
| Unit 9 | Operating | coal: unknown[1] | 125 | subcritical | yes | 2001 | 2024 (planned) | False |
| Unit A | Retired | coal: unknown[1] | 50 | subcritical | yes | 1960 | 2013 | False |
| Unit B | Retired | coal: unknown[1] | 50 | subcritical | yes | 1960 | 2013 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 10 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 11 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 12 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 13 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 2 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 3 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 4 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 5 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 6 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 7 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 8 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 9 | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit A | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit B | Guoneng Jilin Longhua Thermal Power Co Ltd Jilin Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
Project-level coal details
- Coal source(s): domestic
- Permit(s): 吉发改审批〔2024〕67号
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
This Jilin cogen power station was founded in 1955. As of 2014 the plant had 4 operational boilers totaling 650 MW. The units are: 2 X 125 MW and 2 X 200 MW, put into operation from 1988 to 2001.[4]
Description of Expansion
Guodian plans to build two additional coal-fired units at this plant, with a total planned capacity of 700 MW.[5] The environmental impact assessment was reported as suspended in July 2013,[6][7] and a new EIA is underway.[8]
The proposed units were among 15 projects cancelled by China's National Energy Administration (NEA) in September 2016.[9]
Ownership
On August 28, 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[10][11] The merger was completed on November 28, 2017.[12]
2021: Project revived
In Jilin Province's 14th Five-Year Plan, the project revived as a "capacity replacement" project, to replace 690 MW (2*220 and 2*125MW) of existing capacity.[13]
Major equipment contracts for the replacement project Units 12 & 13 were awarded in April 2024[14]. Site preparation and construction contracts followed in mid-2024[15][16]. The project commenced construction in September 2024[17].
In 2025, progress included boiler steel erection, cooling tower completion, and generator stator placement by late 2025[18][19].
In early 2026, turbine rotor placement and boiler hydrostatic tests were completed[20][21]. Unit 12 grid synchronization occurred in July 2026[22].
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "吉林省生态环境厅". sthjt.jl.gov.cn. 2022-08-29. Archived from the original on 2024-01-25. Retrieved 2023-11-15.
- ↑ 3.0 3.1 3.2 3.3 "吉林公司吉林热电厂"等容量替代"新建2×350MW热电联产项目工程勘察设计招标公告_中国电力招标网". www.dlzb.com. 2023-09-14. Archived from the original on 2024-01-25. Retrieved 2023-11-13.
- ↑ "Coal-Fired Plants in China - Heilongjiang & Jilin," Power plants around the world, accessed November 2014
- ↑ "关于吉林省电力工程建设领域突出问题专项治理整改情况的报告",吉林省人民政府网, 2011-06-23
- ↑ "国电集团旗下两工程环评不过关被“暂缓审批”",腾讯财经, 2013-07-12
- ↑ "吉林热电抓好关停机组拆除为节能减排献力",中国国电集团公司, 2013-12-06
- ↑ "吉林热电2×350MW项目获批接入电网",中国国电集团公司, 2013-08-13
- ↑ "全国五大发电集团、地方中国五大发电集团排名 电厂及所属," China NEA, Sep 23, 2016
- ↑ "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
- ↑ "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.
- ↑ "China’s Newly-Established National Energy Investment Group Sets World Records in Its Sector, With Assets of Over CNY1.8 Trillion," Yicai Global, 11-28-2017
- ↑ "吉林省“十四五”规划:推进多个“等容量替代”热电联产项目【附重点电力工程】," 北极星电力网新闻中心, 2021/4/15
- ↑ "哈电汽轮机成功中标国能吉林热电2×350MW热电联产项目汽轮机及其辅助设备". 北极星电力网. 2024-04-03. Retrieved 2024-04-04.
{{cite web}}: CS1 maint: url-status (link) - ↑ "2×350MW!国能吉林热电厂五通一平招标". 北极星电力网. 2024-05-11. Retrieved 2024-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "4150.7万元!国能吉林热电厂新建2×350MW项目五通一平中标公示". 北极星电力网. 2024-06-25. Retrieved 2026-06-26.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能吉林热电厂等容量替代新建2×350兆瓦热电联产项目建设火热,进入锅炉钢架吊装阶段". 微信公众平台. 2025-03-21. Retrieved 2025-06-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能吉林热电厂"等容量替代"新建2×350兆瓦热电联产项目C标段两座4000平方米冷却塔外筒壁同时结顶". 微信公众平台. 2025-09-26. Retrieved 2025-11-18.
{{cite web}}: CS1 maint: url-status (link) - ↑ "吉林热电项目1号机组发电机定子吊装就位". 微信公众平台. 2025-10-21. Retrieved 2025-11-18.
{{cite web}}: CS1 maint: url-status (link) - ↑ "吉林厂等容量替代项目2号机组转子一次穿装成功". 微信公众平台. 2026-01-30. Retrieved 2026-01-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能吉林热电厂"等容量替代"新建2×350MW热电联产项目2号机组锅炉水压、汽轮机扣缸圆满成功". 微信公众平台. 2026-03-31. Retrieved 2026-06-11.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能吉林热电2×35万千瓦燃煤发电项目1号机组首次并网". 北极星电力网. 2026-07-28. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link)