Jimsar cogen power station (大唐新疆发电公司吉木萨尔分公司热电联产, 准东能源吉木萨尔2×350MW热电联产项目) is a power station under construction in Beiting Industry Park, Jimsar, Changji, Xinjiang, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jimsar cogen power station Beiting Industry Park, Jimsar, Changji, Xinjiang, China 43.959, 89.213 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 43.959, 89.213

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Unit 1 Construction[2] coal: unknown[3][1] 350[1] supercritical[1] yes[1] 2026 (planned)[2] False
Unit 2 Construction[2] coal: unknown[3][1] 350[1] supercritical[1] yes[1] 2026 (planned)[2] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Huadian Jimusar Thermal Power Co Ltd [100%] China Huadian Corp Ltd [100.0%]
Unit 2 Huadian Jimusar Thermal Power Co Ltd [100%] China Huadian Corp Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic
  • Permit(s): First permitted on 7 March 2016. Re-permitted for resume construction 9 December 2024 新发改能源[2024]713号[1]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

China Datang and the Xinjiang regional government proposed a power station of two units of 350 MW each in the city of Changji. They plan for construction to begin in 2014 and operation in 2015,[4] however in 2015 the company was still seeking approval for construction to begin.[5][6]

The plant was permitted in March 2016.[7] Construction began in March 2018.[8]

As of January 2022, with no apparent construction progress since at least January 2019 based on Planet satellite imagery, the power station was presumed shelved. As of June 2023, with still no apparent progress since January 2019, the project was presumed cancelled.

The project was revived in 2025. In May 2025, bidding announcements were released following government approval in December 2024[9]. A resumption ceremony was held in May 2025[10]. Major contractor appointments and equipment procurement occurred through 2025[11]. By late 2025, the main structure was topped out, and winter construction continued[12].

In May 2026, cooling tower topping out and generator stator placement were completed[13]. Unit 1 boiler hydrostatic test passed in July 2026[14].

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 https://web.archive.org/web/20260423175058/https://mp.weixin.qq.com/mp/wappoc_appmsgcaptcha?poc_token=HP9b6mmjHOXS660L7lEXPhD7LC42htfcmRPtDOja&target_url=https%3A%2F%2Fmp.weixin.qq.com%2Fs%2FnKsqbLtdUGCNIq7WGQQHiA. Archived from the original on 2026-04-23. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20260423175118/https://news.bjx.com.cn/html/20250819/1456628.shtml. Archived from the original on 2026-04-23. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  4. "大唐吉木萨尔热电联产项目可研评审会召开," 中国电力新闻网, 2013.07.11
  5. "大唐吉木萨尔热电联产一期2×350MW工程环境影响评价公众参与信息," 2015-05-06
  6. "大唐吉木萨尔热电联产项目获批复," 新疆能源网, 2015年01月07日
  7. "大唐吉木萨尔2×35万千瓦热电联产项目正式获批," 亚心网, 2016年03月10日
  8. "大唐吉木萨尔2×350MW热电联产项目开工," 中电新闻网, 2018-03-28
  9. "恢复建设!吉木萨尔2×350MW热电联产项目工程总承包、全过程造价咨询服务、工程监理公开招标公告". 微信公众平台. 2025-05-02. Retrieved 2025-05-02.{{cite web}}: CS1 maint: url-status (link)
  10. "准东能源集团吉木萨尔2×350MW热电联产项目工程举行复工仪式". 北极星电力网. 2025-05-12. Retrieved 2025-05-12.{{cite web}}: CS1 maint: url-status (link)
  11. "准东能源吉木萨尔2×350MW热电联产项目工程总承包、工程监理中标结果公告". 微信公众平台. 2025-06-16. Retrieved 2025-06-23.{{cite web}}: CS1 maint: url-status (link)
  12. "新疆吉木萨尔热电联产项目主体封顶". 微信公众平台. 2025-11-18. Retrieved 2025-12-09.{{cite web}}: CS1 maint: url-status (link)
  13. "五一假期,新准热电公司2×350MW热电联产项目建设取得重要进展". 微信公众平台. 2026-05-01. Retrieved 2026-06-11.{{cite web}}: CS1 maint: url-status (link)
  14. "吉木萨尔2×35万千瓦热电联产工程1号锅炉水压试验一次成功". 微信公众平台. 2026-07-06. Retrieved 2026-07-15.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.