Jinchang Tengger power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Jinchang Tengger power station (甘肃腾格里沙漠河西新能源基地配套金昌2×1000兆瓦调峰煤电项目, 华电金昌腾格里发电厂) is a power station under construction in Hexipu, Yongchang, Jinchang, Gansu, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Jinchang Tengger power station | Hexipu, Yongchang, Jinchang, Gansu, China | 38.364337, 102.097343 (exact)[1] |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 38.364337, 102.097343
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Emergency/Backup |
|---|---|---|---|---|---|
| Unit 1 | Construction[2][3] | coal: unknown[4][3] | 1000[3] | ultra-supercritical[3] | False |
| Unit 2 | Construction[2][3] | coal: unknown[4][3] | 1000[3] | ultra-supercritical[3] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Huadian Gansu Energy Co Ltd [100%][1] | China Huadian Corp Ltd [52.4%]; Huadian Power International Co Ltd [31.0%]; unknown [16.6%] |
| Unit 2 | Huadian Gansu Energy Co Ltd [100%][1] | China Huadian Corp Ltd [52.4%]; Huadian Power International Co Ltd [31.0%]; unknown [16.6%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
As one of the peak-shaving supporting power sources for the Hexi clean energy base in the Tengger Desert, the Gansu Huadian Jinchang Tengger 2×1000MW coal power project started the project preparation stage in 2023. The call for the project environmental impact assessment was released on 1 February 2023[5] and the call for feasibility study design was announced at the end of March[6].
Major equipment contracts were awarded in early 2024[7]. By September 2024, construction officially commenced with excavation[8]. Equipment procurement and construction tenders continued through 2025[9].
In 2025, significant progress included boiler beam hoisting, cooling tower column work, and boiler heating surface placement[10][11]. In October 2025, Unit 2 boiler steel hoisting and other activities advanced.
In 2026, generator rotor placement for Unit 1 occurred in March[12], Unit 2 generator stator placement in March[13], and power transmission was achieved in June 2026[14].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 https://slt.gansu.gov.cn/slt/c209640/202403/173878249.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://mp.weixin.qq.com/s/F1V9NwFf4Z4Gj8bEGFiNQA.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 "2×1000MW!甘肃华电金昌腾格里煤电项目可行性研究阶段勘察设计招标-北极星火力发电网". news.bjx.com.cn. 2023-03-30. Archived from the original on 2024-01-25. Retrieved 2023-10-12.
- ↑ 4.0 4.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 永昌县发展和改革局 (2023-02-27). "甘肃华电金昌腾格里2×1000MW煤电项目环评第一次信息公示". 北极星火力发电网.
{{cite web}}: CS1 maint: url-status (link) - ↑ "甘肃华电金昌腾格里2×1000MW煤电项目可行性研究阶段勘察设计招标公告". 中国电力招标采购网. 2023-03-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华电金昌2×1000兆瓦调峰煤电项目三大主机中标结果公示". 微信公众平台. 2024-01-05. Retrieved 2024-01-05.
{{cite web}}: CS1 maint: url-status (link) - ↑ "甘肃腾格里沙漠河西新能源基地配套金昌2×1000兆瓦调峰煤电项目烟囱基础开挖". 北极星电力网. 2024-09-17. Retrieved 2024-09-19.
{{cite web}}: CS1 maint: url-status (link) - ↑ "甘肃金昌2×1000兆瓦调峰煤电项目第二批辅机设备采购招标". 北极星电力网. 2024-10-12. Retrieved 2024-10-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "金昌2×1000兆瓦调峰煤电项目建设工程1号锅炉大板梁正式开吊". 微信公众平台. 2025-05-19. Retrieved 2025-05-27.
{{cite web}}: CS1 maint: url-status (link) - ↑ "甘肃华电金昌2×1000兆瓦调峰煤电项目1号锅炉受热面首片吊装就位". 微信公众平台. 2025-06-08. Retrieved 2025-06-19.
{{cite web}}: CS1 maint: url-status (link) - ↑ "甘肃华电金昌2x1000MW调峰煤电项目1号机组发电机转子穿装顺利完成". 微信公众平台. 2026-03-20. Retrieved 2026-04-09.
{{cite web}}: CS1 maint: url-status (link) - ↑ "金昌2×1000兆瓦调峰煤电项目#2机组发电机定子顺利吊装就位". 微信公众平台. 2026-03-25. Retrieved 2026-04-09.
{{cite web}}: CS1 maint: url-status (link) - ↑ "甘肃腾格里沙漠河西新能源基地配套金昌调峰煤电项目2号机组倒送电一次成功". 微信公众平台. 2026-06-26. Retrieved 2026-07-13.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.