Jinchuan Group WP&RKA power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Jinchuan Group WP&RKA power station is an operating power station of at least 150-megawatts (MW) in Kawasi, Obi, South Halmahera, Maluku, Indonesia. It is also known as 金川集团印尼WP&RKA奥比岛自备电厂.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jinchuan Group WP&RKA power station Kawasi, Obi, South Halmahera, Maluku, Indonesia -1.56606, 127.415933 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3: -1.56606, 127.415933

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Operating coal: unknown[1] 50 unknown 2019 False
Unit 2 Operating coal: unknown[1] 50 unknown 2019 False
Unit 3 Operating coal: unknown[1] 50 unknown 2019 False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 WP&RKA Company [100%] Gansu Provincial State-owned Assets Investment Group Co Ltd [48.0%]; unknown [26.9%]; China Development Bank Corp [13.5%]; Jinchuan Group Co Ltd [11.6%]
Unit 2 WP&RKA Company [100%] Gansu Provincial State-owned Assets Investment Group Co Ltd [48.0%]; unknown [26.9%]; China Development Bank Corp [13.5%]; Jinchuan Group Co Ltd [11.6%]
Unit 3 WP&RKA Company [100%] Gansu Provincial State-owned Assets Investment Group Co Ltd [48.0%]; unknown [26.9%]; China Development Bank Corp [13.5%]; Jinchuan Group Co Ltd [11.6%]

Project-level captive use details

  • Captive industry: Nickel


Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The power plant is part of the Jinchuan ferronickel smelter, which was constructed as part of China's "One Belt, One Road" program. Unit 1 was commissioned in May 2019 and Unit 2 was commissioned in June 2019. Unit 3 was commissioned in September 2019.[2]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 中圣“一带一路”项目——印尼金川WP&PKA红土镍矿项目电厂工程1号机组并网发电一次成功, Sun Power, Sept. 24, 2019

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.