Jining power station (京能内蒙古京宁热电) is an operating power station of at least 2020-megawatts (MW) in Jining, Ulanqab, Inner Mongolia, China. It is also known as 集宁热电二期 (Phase II Unit 3, Phase II Unit 4).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Jining power station | Jining, Ulanqab, Inner Mongolia, China | 41.053294, 113.153289 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 41.053294, 113.153289
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase I Unit 1 | operating | coal - unknown | 350 | supercritical | 2016 | – |
Phase I Unit 2 | operating | coal - unknown | 350 | supercritical | 2016 | – |
Phase II Unit 3 | operating | coal - unknown | 660 | ultra-supercritical | 2022 | – |
Phase II Unit 4 | operating | coal - unknown | 660 | ultra-supercritical | 2023 | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Phase I Unit 1 | Inner Mongolia Jingning Thermal Power Co Ltd [100.0%] |
Phase I Unit 2 | Inner Mongolia Jingning Thermal Power Co Ltd [100.0%] |
Phase II Unit 3 | Inner Mongolia Jingning Thermal Power Co Ltd [100.0%] |
Phase II Unit 4 | Inner Mongolia Jingning Thermal Power Co Ltd [100.0%] |
Project-level coal details
- Permit(s): May 2020, July 23, 2015
Background on Project
In May 2015, Beijing Energy Group was constructing a 2 x 350 MW supercritical coal plant in the city of Jining. It started construction before it received environmental approval, therefore, the provincial environmental authority ordered the halt of the construction.[1]
The first two units were permitted in 2015[2][3] and completed in 2016.[4]
In December 2019, Beijing Energy Group proposed a 2 x 660 MW expansion at the power station.[5] The units were permitted for construction in May 2020.[6]
Construction began in 2020.[7]
Unit 3 went into operation in December 2022.[8][9] Unit 4 went into operation in April 2023.[10]
Articles and Resources
References
- ↑ "内蒙古自治区环境保护厅责令改正违法行为决定书"内蒙古环保厅, 2015-05-20
- ↑ "京能集宁热电联产机组工程正式获得核准," Baotou Teng Bang Spray, 2015年7月29日
- ↑ "京能集宁热电工程2号机组汽轮机扣盖一次成功," 集宁项目部, 2015-9-1
- ↑ "京宁热电取得热电联产机组认定证书," Power Beijing, September 27, 2016
- ↑ "内蒙古京能集宁二期扩建2×660MW热电联产工程第一次环境影响评价信息公示," Ulanqab Prefecture website, 2019-12-03
- ↑ "京能电力:集宁二期热电联产项目获核准," 证券时报网, 2020/5/12
- ↑ "2×660MW!京能集宁二期项目开工奠基," 北极星电力网新闻中心, 2020/5/6
- ↑ "京宁二期召开机组整套启动验收委员会第一次会议," Jingneng Power, 2022-11-28
- ↑ "2×660MW!京能电力京宁二期3号机组圆满完成168小时试运行," BJX, 2022-12-29
- ↑ "【项目】火电|2×1000MW!甘肃电投张掖燃煤扩建4号锅炉基础土方顺利开挖/2×660MW!京能集宁二期热电联产4号机组投运!," mp.weixin.qq.com, 2023-04-25