Jiujiang LNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Jiujiang LNG Terminal, also known as 九江LNG内河接收转运站, is a cancelled (inferred 4 y) LNG import terminal in China.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Jiujiang LNG Terminal Shawan, Jiujiang, Jiangxi, China[1][2] 29.7786154, 116.2638593 (approximate)

The map below shows the approximate location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Jiujiang LNG Terminal import[1] cancelled (inferred 4 y) – – False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Jiujiang LNG Terminal import[1] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Jiujiang LNG Terminal import[1] cancelled (inferred 4 y) 2019[1] – – –[3][3] –

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Jiujiang LNG Terminal import[1] cancelled (inferred 4 y) Jiangxi Investment Gas Co Ltd [100%][4] Jiangxi Natural Gas Group Co Ltd [54.0%]; China Petrochemical Corp [46.0%] –

Background

According to the "National Coastal and Inland River LNG Terminal Layout Plan (2035)" compiled by the Ministry of Transport, 5 inland river LNG terminals will be developed along the Yangtze River. Jiujiang LNG Terminal is one of them. [5][6]

The project is in feasibility study stage, and there had been no additional progress as of April 2021.[5]

As of June 2022, it is still considered proposed.

As of January 2023, there had been no development on the terminal for over two years, and it was presumed to be shelved.

No further news as of January 2024. It's considered cancelled as of June 2025.

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.163.com/dy/article/ED55K6ET0518W270.html. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://xueqiu.com/9803086374/124000873. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 http://www.hxny.com/nd-40951-0-17.html. {{cite web}}: Missing or empty |title= (help)
  4. ↑ https://www.qcc.com/weblogin?back=%2Ffirm%2Fe8da7ee31d3e1af1dd4f89590756d502.html. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 "交通部审议《关于全国沿海与长江干线液化天然气接收站码头布局发展的意见》". 网易 www.163.com. 2019-04-20. Retrieved 2021-04-09.{{cite web}}: CS1 maint: url-status (link)
  6. ↑ "向海而生,LNG内河接收站布局、困局与未来". 华夏能源网 www.hxny.com. 2019-03-28. Retrieved 2021-04-09.{{cite web}}: CS1 maint: url-status (link)