Jizzakh Combined Cycle Gas Turbine Power Plant
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Jizzakh Combined Cycle Gas Turbine Power Plant (теплоэлектростанция в Джизакской области (Russian)) is a power station under construction in Halqabod MFY, Sharof-Rashidov, Jizzax, Uzbekistan. It is also known as Cengiz Enerji Jizzakh CHP power station.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Jizzakh Combined Cycle Gas Turbine Power Plant | Halqabod MFY, Sharof-Rashidov, Jizzax, Uzbekistan | 40.092026, 67.943349 (exact)[1][2][3] |
Unit-level coordinates (WGS 84):
- 1: 40.092026, 67.943349
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction[4][5][6][7][8][9][10][11][12][13] | fossil gas: natural gas[10][14] | 550[11][15][13][3] | combined cycle[8][16][10][3] | yes[9] | 2027 (planned)[15][7][9][10][11][13] | Siemens Energy: SGT5-4000F[17][3] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Operator | Owner | Parent |
|---|---|---|---|
| 1 | Cenergo[1][18] | Cengiz Enerji Sanayii ve Ticaret AŞ [100%][8] | Cengiz Holding AS [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Construction began in August 2023 and will be carried out by Turkish investor Cengiz Enerji and engineering design company Cenergo LLC established by Cengiz Holding. An area of 9.5 hectares has been allocated for the power station. The cost of the 450 MW thermal power plant was estimated to be $340 million, but the Turkish investors offered to invest $500 million and build a 520 MW plant. The station will generate 4.1 billion kWh of electricity per year. Commissioning of the thermal power plant is scheduled for 2025.[19]
In November 2023, President Shavkat Mirziyoyev signed a decree on the construction of the plant. According to the presidential decree, the capacity has been raised to 550 MW. The facility is still planned to be commissioned in 2025. According to the document, the investor and project company will be in charge of design, financing, construction and operation of the power station. The project company undertakes to guarantee the sale of produced electricity to the National Electric Networks (NES) of Uzbekistan company in a guaranteed manner. NES also undertakes to guarantee the purchase of electricity for 25 years. Under the investment agreement and payment agreement, electricity will be purchased at a fixed tariff in a foreign currency, but paid in national currency. The tariff is not disclosed.[20]
As of November 2024, the construction is in progress.[21] The plant is expected to be commissioned in 2026.[22] The power plant will consist of of one gas turbine Siemens S SGT54000F V10 (365.3 MW) and one steam turbine Siemens SST-700/900 (185.3 MW), manufactured in Germany. Cenergo LLC is responsible for the construction, commissioning works and making the facility to operate.[23]
In December 2024, during a briefing the press secretary of the Uzbekistan's Ministry of Energy mentioned that the power plant would be commissioned in 2027.[24]
According to the Cenergo's website, as of September 2025, the power plant is under construction and is expected to be commissioned in 2026.[25]
In October 2025, it was reported that Cenergo had successfully completed the financial close for the Jizzakh Combined Cycle Gas Turbine Power Plant. The long-term loan, totaling EUR 164.25 million, was secured through DZ BANK and DenizBank AG, backed by Euler Hermes export credit cover. The plant is scheduled to be commissioned on January 1, 2027.[26]
As of April 2027, the construction is ingoing. The power plant was designed to accommodate up to 50% hydrogen blending, once the required future investments are completed.[27]
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20250213220430/https://cenergo.uz/en/about-us-2/. Archived from the original on 2025-02-13.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.google.com/maps/place/Cenergo+Gengiz+Energy+Jizzax+Project/@40.0926534,67.9420452,17z/data=!4m14!1m7!3m6!1s0x38b293f2885611ef:0x345da43056b25e51!2sJizzax+KFUK!8m2!3d40.0951608!4d67.9354416!16s%2Fg%2F11n_yg_1pr!3m5!1s0x38b293002d631381:0x1101023361247674!8m2!3d40.0919375!4d67.9433364!16s%2Fg%2F11ldq2thtl!5m1!1e1?entry=ttu&g_ep=EgoyMDI0MTExMy4xIKXMDSoASAFQAw%3D%3D.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 (PDF) https://web.archive.org/web/20250312222908/https://cenergo.uz/wp-content/uploads/2024/07/125-1105-SR-eng_final.pdf. Archived from the original (PDF) on 2025-03-12.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20250312222143/https://minenergy.uz/ru/news/view/4085. Archived from the original on 2025-03-12.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.txfnews.com/articles/7830/uzbekistan-fires-energy-ambitions-with-ccgt-upgrades.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.linkedin.com/posts/the-successful-financial-closure-of-the-jizzakh-share-7442191042394853376-Z9Q8/.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://cenergo.uz/en/jizzakh-natural-gas-combined-cycle-power-plant-project/.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 8.2 https://web.archive.org/web/20230429065102/https://www.uzdaily.uz/en/post/80600. Archived from the original on 2023-04-29.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 9.2 https://akipress.com/news:724742:Construction_of_thermal_power_plant_starts_in_Jizzakh_region/.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 10.2 10.3 "Cenergo". cenergo.uz. Archived from the original on 2025-03-12. Retrieved 2024-11-18.
- ↑ 11.0 11.1 11.2 https://gov.uz/uz/minenergy/news/view/29602.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20230809174222/https://kun.uz/en/news/2023/08/09/cengiz-holding-plans-to-implement-projects-worth-5-billion-in-uzbekistan. Archived from the original on 2023-08-09.
{{cite web}}: Missing or empty|title=(help) - ↑ 13.0 13.1 13.2 "Cengiz Enerji to erect 550 MW combined cycle power plant in Jizzakh province". tashkenttimes.uz. Archived from the original on 2024-04-15. Retrieved 2024-04-01.
- ↑ https://web.archive.org/web/20230330131436/https://www.spot.uz/ru/2023/03/15/power-plants. Archived from the original on 2023-03-30.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 https://www.cengizenerji.com.tr/en/basinbultenleri/cengiz-enerji-ozbekistandaki-yeni-santralinin-finansman-kapanisini-tamamladi.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20250312222333/https://nem-energy.com/2024/04/05/nem-energy-signs-contract-with-cengiz-enerji/. Archived from the original on 2025-03-12.
{{cite web}}: Missing or empty|title=(help) - ↑ https://nem-energy.com/projects/jizzakh-project/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.cengizholding.com.tr/en/areas-of-activity/energy.
{{cite web}}: Missing or empty|title=(help) - ↑ "Construction of thermal power plant starts in Jizzakh region". AKIpress. August 12, 2023. Retrieved November 3, 2023.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Cengiz Enerji to erect 550 MW combined cycle power plant in Jizzakh province". The Tashkent Times. November 14, 2024. Retrieved April 1, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Президент Узбекистана провел встречу с руководителями турецких компаний". Ministry of Energy of the Republic of Uzbekistan. June 28, 2024. Retrieved November 18, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Facilities". Cenergo. 2024. Retrieved November 18, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Construction df Combined-Cycle Gas Turbine Power Plant with a Capacity of 550 MW. Scoping Report" (PDF). Cenergo Energy. May 16, 2022. Retrieved November 18, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Information about major projects being implemented in our country to introduce solar, wind and thermal power plants". Government Portal of the Republic of Uzbekistan. December 6, 2024. Retrieved April 8, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Jizzakh Natural Gas Combined Cycle Power Plant Project". Cenergo. 2025. Retrieved September 18, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Cengiz Enerji Completes Financial Close for New Power Plant in Uzbekistan | Cengiz Enerji". www.cengizenerji.com.tr. 2025-10-08. Retrieved 2026-04-08.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Cenergo's Jizzakh Power Plant Wins Asia-Pacific Energy Deal of the Year | Cengiz Enerji A.Ş. posted on the topic | LinkedIn". www.linkedin.com. 2026-03-24. Retrieved 2026-04-08.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.