Junggar Suancigou power station
From Global Energy Monitor
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Junggar Suancigou power station (京能内蒙古京泰发电公司酸刺沟发电厂) is an operating power station of at least 1920-megawatts (MW) in Xuejiawan Town Data Villege, Junggar, Ordos, Inner Mongolia, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Junggar Suancigou power station | Xuejiawan Town Data Villege, Junggar, Ordos, Inner Mongolia, China | 39.711744, 111.200548 (exact) |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 39.711744, 111.200548
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: waste coal[1] | 300 | subcritical | yes | 2010 | False |
| Phase I Unit 2 | Operating | coal: waste coal[1] | 300 | subcritical | yes | 2010 | False |
| Phase II Unit 3 | Operating[2] | coal: unknown[1] | 660 | ultra-supercritical | – | 2023[2] | False |
| Phase II Unit 4 | Operating[2] | coal: unknown[1] | 660 | ultra-supercritical | – | 2023[2] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Inner Mongolia Jingtai Power Co Ltd [100%] | Beijing Jingneng Power Co Ltd [51.0%]; Inner Mongolia Yitai Coal Co Ltd [29.0%]; Guangdong Hengjian Investment Holding Co Ltd [9.1%]; Guangdong Electric Power Development Co Ltd [8.0%]; China Huaneng Group Co Ltd [2.9%] |
| Phase I Unit 2 | Inner Mongolia Jingtai Power Co Ltd [100%] | Beijing Jingneng Power Co Ltd [51.0%]; Inner Mongolia Yitai Coal Co Ltd [29.0%]; Guangdong Hengjian Investment Holding Co Ltd [9.1%]; Guangdong Electric Power Development Co Ltd [8.0%]; China Huaneng Group Co Ltd [2.9%] |
| Phase II Unit 3 | Inner Mongolia Jingtai Power Co Ltd [100%] | Beijing Jingneng Power Co Ltd [51.0%]; Inner Mongolia Yitai Coal Co Ltd [29.0%]; Guangdong Hengjian Investment Holding Co Ltd [9.1%]; Guangdong Electric Power Development Co Ltd [8.0%]; China Huaneng Group Co Ltd [2.9%] |
| Phase II Unit 4 | Inner Mongolia Jingtai Power Co Ltd [100%] | Beijing Jingneng Power Co Ltd [51.0%]; Inner Mongolia Yitai Coal Co Ltd [29.0%]; Guangdong Hengjian Investment Holding Co Ltd [9.1%]; Guangdong Electric Power Development Co Ltd [8.0%]; China Huaneng Group Co Ltd [2.9%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 "京泰酸刺沟电厂1000千伏送出工程投运-北极星输配电网". news.bjx.com.cn. 2023-07-26. Archived from the original on 2024-01-25. Retrieved 2023-11-08.
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
