Jupiter wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Jupiter wind farm is a cancelled wind farm in Tarago, New South Wales, Australia.

Project Details

Table 1: Phase-level project details for Jupiter wind farm

Status Nameplate capacity Type Owner
Cancelled[1] 350 MW[2] Onshore[3] EPYC[1]

Location

Table 2: Phase-level location details for Jupiter wind farm

Location Coordinates (WGS 84)
Tarago, New South Wales, Australia[1] -35.0723, 149.6503 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://reneweconomy.com.au/jupiter-wind-farm-plans-abandoned-face-community-opposition-87095/. {{cite web}}: Missing or empty |title= (help)
  2. "Wind Map of Australia 2021" (PDF). ecogeneration. January 2021. Archived (PDF) from the original on November, 9, 2021. Retrieved June 7, 2021. {{cite web}}: Check date values in: |archive-date= (help)
  3. https://stopthesethings.com/2018/03/08/nsw-planning-dept-scotches-jupiter-wind-farm-project-locals-ecstatic/. {{cite web}}: Missing or empty |title= (help)