Ketapang Bangun Sarana power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Ketapang Bangun Sarana power station is an operating power station of at least 75-megawatts (MW) in Jidabang, Ketapang, Kalimantan, Indonesia. It is also known as Jinjiang Park power station.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Ketapang Bangun Sarana power station | Jidabang, Ketapang, Kalimantan, Indonesia | -2.2356003, 110.1066255 (exact)[1] |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: -2.2356003, 110.1066255
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Operating[2] | coal: unknown[3][2] | 45[2] | unknown | 2025[2] | False |
| Unit 2 | Operating[2] | coal: unknown[3][2] | 30[2] | unknown | 2025[2] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Hangzhou Jinjiang Group Co Ltd [100%] | natural person(s) [46.6%]; Zhejiang Hengjia Holding Co Ltd [27.0%]; Hangzhou Yande Industrial Co Ltd [26.3%] |
| Unit 2 | Hangzhou Jinjiang Group Co Ltd [100%] | natural person(s) [46.6%]; Zhejiang Hengjia Holding Co Ltd [27.0%]; Hangzhou Yande Industrial Co Ltd [26.3%] |
Project-level captive use details
- Captive industry: Aluminum[1]
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
In March 2024, cooperation officially began between Indonesia's West Kalimantan Province and China's Hangzhou Jinjiang Group for the development of an industrial park, including alumina and bauxite mining.[4]
As of July 2024, the industrial park was referred to as Indonesia Jinjiang Park Comprehensive Industrial Park, PT Borneo Alumina Prima Alumina Industry Project, and Ketapang Bangun Sarana Industrial Park. The development would include an alumina plant with an annual production capacity of 4.5 million tons, with the first phase having a production capacity of 1.5 million tons. The investment reportedly had a value of approximately US$1.2 billion.[5]
China Power Construction reportedly won the construction bid in February 2024 and began construction the following month.[6]
In April 2025, the second of two coal-fired units began operating in the industrial area. The units had capacities of 45 MW and 30 MW.[4]
Articles and Resources
References
- ↑ 1.0 1.1 https://www.hpcarbonmachine.com/news/jinjiang-group-indonesia-aluminum-industry-project/.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://www.powerchina.cn/col/col16624/art/2025/art_1429864781.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 印尼锦江电厂项目2号机组投产, 中国电力建设集团, April 14, 2025
- ↑ Jinjiang Group Indonesia Aluminum Industry Project, Hwapeng, July 18, 2024
- ↑ 中国电建印尼锦江氧化铝综合产业园一期项目第一方混凝土顺利浇筑, 中国电力建设集团, April 7, 2024
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
