Kherson solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Scatec Atlas
Kherson solar farm is a shelved solar photovoltaic (PV) farm in Holoprystansky district, Kherson Oblast, Ukraine.
Project Details
Table 1: Phase-level project details for Kherson solar farm
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Shelved[1][2][3] | 50 MWac[4] | PV[4] | Atlas Capital Energy LLC[4][5] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Kherson solar farm
Location | Coordinates (WGS 84) |
---|---|
Holoprystansky district, Kherson Oblast, Ukraine[6] | 46.1660, 34.8101 (approximate)[6] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ http://reform.energy/news/norvezhskaya-scatec-solar-ostanovila-stroitelstvo-ses-v-khersonskoy-oblasti-moshchnostyu-65-mvt-iz-za-vozmozhnogo-sokrashcheniya-srokov-pre-ppa-13204.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.kyivpost.com/business/scatec-solar-puts-65mw-project-on-hold-due-to-tariff-uncertainty.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://taiyangnews.info/markets/scatecs-operative-ukraine-pv-portfolio-now-336-mw-strong/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 http://www.atlasglobal.energy/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://ubn.news/in-kherson-scatec-through-its-atlas-capital-energy-llc-is-building-this-spring-a-50-mw-solar-station-in-hola-prystan/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://www.strategeast.org/norwegian-company-scatec-solar-to-help-build-50-mw-solar-power-plant-in-ukraines-kherson-region/.
{{cite web}}
: Missing or empty|title=
(help)