Kidston Renewable Energy Hub wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: K-3 Wind Project

Kidston Renewable Energy Hub wind farm is a wind farm in pre-construction in Queensland, Australia.

Project Details

Table 1: Phase-level project details for Kidston Renewable Energy Hub wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner
3 Pre-construction[1] 2025 (planned)[2] 258 MW[1] Onshore[2] Genex Power; J-Power[3]

Location

Table 2: Phase-level location details for Kidston Renewable Energy Hub wind farm

Phase Name Location Coordinates (WGS 84)
3 Queensland, Australia[4] -27.4714, 153.0294 (approximate)[4]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://company-announcements.afr.com/asx/gnx/6b25a3b1-6b79-11ed-869e-9add0a948378.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://esdnews.com.au/j-power-and-genex-collaborate-on-kidston-wind-project/. {{cite web}}: Missing or empty |title= (help)
  3. https://reneweconomy.com.au/genex-kick-starts-kidston-wind-project-securing-partnership-with-j-power-38168/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://www.northqueenslandregister.com.au/story/7263047/fnq-renewable-sector-promises-hundreds-of-jobs/. {{cite web}}: Missing or empty |title= (help)