Kings Point Wind Energy Center

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Kings Point Wind Energy Center is an operating wind farm in Golden City, Lawrence County, Missouri, United States.

Project Details

Table 1: Phase-level project details for Kings Point Wind Energy Center

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2021[1] 149 MW[2] Onshore[2] Empire District Electric Company[2] Empire District Electric Company[3]

Location

Table 2: Phase-level location details for Kings Point Wind Energy Center

Phase Name Location Coordinates (WGS 84)
1 Golden City, Lawrence County, Missouri, United States[2] 37.2698, -94.042 (exact)[4]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://efis.psc.mo.gov/mpsc/commoncomponents/viewdocument.asp?DocId=936360092. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
  3. (PDF) https://www.tenaska.com/wp-content/uploads/2019/03/North-Fork-Ridge_Kings-Point-Fact-Sheet.pdf. {{cite web}}: Missing or empty |title= (help)
  4. USWind2023