Kings Point Wind Energy Center
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Kings Point Wind Energy Center is an operating wind farm in Golden City, Lawrence County, Missouri, United States.
Project Details
Table 1: Phase-level project details for Kings Point Wind Energy Center
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2021[1] | 149.4 MW[1] | Onshore[2] | Empire District Electric Co [100%][2] | Empire District Electric[3] |
Location
Table 2: Phase-level location details for Kings Point Wind Energy Center
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Golden City, Lawrence County, Missouri, United States[1] | 37.2698, -94.0420 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 2.0 2.1 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ (PDF) https://web.archive.org/web/20240131015010/https://www.tenaska.com/wp-content/uploads/2019/03/North-Fork-Ridge_Kings-Point-Fact-Sheet.pdf. Archived from the original (PDF) on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)