Kings Point Wind Energy Center
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Kings Point Wind Energy Center is an operating wind farm in Golden City, Lawrence County, Missouri, United States.
Project Details
Table 1: Phase-level project details for Kings Point Wind Energy Center
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2021[1] | 149 MW[2] | Onshore[2] | Empire District Electric Company[2] | Empire District Electric Company[3] |
Location
Table 2: Phase-level location details for Kings Point Wind Energy Center
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Golden City, Lawrence County, Missouri, United States[2] | 37.2698, -94.042 (exact)[4] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://efis.psc.mo.gov/mpsc/commoncomponents/viewdocument.asp?DocId=936360092.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
- ↑ (PDF) https://www.tenaska.com/wp-content/uploads/2019/03/North-Fork-Ridge_Kings-Point-Fact-Sheet.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ USWind2023