Kingston Energy Complex
From Global Energy Monitor
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Kingston Energy Complex is an operating power station of at least 65-megawatts (MW) in Roane, Tennessee, United States with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Kingston Energy Complex | Roane, Tennessee, United States | 35.8992, -84.5194 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1, 10, 11, 12, 13, 14, 15, 16, 2, 3, 4, 5, 6, 7, 8, 9, CC: 35.8992, -84.5194
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
10 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
11 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
12 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
13 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
14 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
15 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
16 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
2 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
3 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
4 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
5 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
6 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
7 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
8 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
9 | Construction[2][3][4] | fossil gas: natural gas[1][4] | 65.8[1][4] | gas turbine[4][5] | no[2][3] | 2025 (planned)[4][6][7] |
CC | Construction[2][3][4] | fossil gas: natural gas[1][4] | 777.8[1][5] | combined cycle[5] | no[2][3] | 2027 (planned)[4][6][7] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
10 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
11 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
12 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
13 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
14 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
15 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
16 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
2 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
3 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
4 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
5 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
6 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
7 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
8 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
9 | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
CC | Tennessee Valley Authority [100%][3][1] | Tennessee Valley Authority [100.0%] |
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 2.31 2.32 2.33 https://www.wbir.com/article/news/local/kingston-energy-complex-construction-underway/51-edb731d5-e3ac-4981-9974-15ea1fa1345e.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 3.28 3.29 3.30 3.31 3.32 3.33 3.34 3.35 3.36 3.37 3.38 3.39 3.40 3.41 3.42 3.43 3.44 3.45 3.46 3.47 3.48 3.49 3.50 https://www.tva.com/news-media/releases/tva-to-retire-kingston--build-state-of-the-art-energy-complex.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 4.27 4.28 4.29 4.30 4.31 4.32 4.33 4.34 4.35 4.36 4.37 4.38 4.39 4.40 4.41 4.42 4.43 4.44 4.45 4.46 4.47 4.48 4.49 4.50 4.51 4.52 4.53 4.54 4.55 4.56 4.57 4.58 4.59 4.60 4.61 4.62 4.63 4.64 4.65 4.66 4.67 4.68 4.69 4.70 4.71 4.72 4.73 4.74 4.75 4.76 4.77 4.78 4.79 4.80 4.81 4.82 https://www.turbomachinerymag.com/view/tva-s-grid-transformation-pairs-solar-and-natural-gas-to-phase-out-coal?utm_source=chatgpt.com.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 https://www.tva.com/news-media/releases/tva-requests-proposals-for-battery-storage-at-kingston-energy-complex.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 https://www.knoxnews.com/story/news/local/2025/03/13/tva-builds-kingston-energy-complex-to-replace-coal-plant-with-gas/81989720007/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 https://gem-project-db.herokuapp.com/projects/edit/100001047059.
{{cite web}}
: Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.