Knockduff wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Boggeragh 2
Knockduff wind farm is an operating wind farm in Municipal District of Macroom, County Cork, Ireland.
Project Details
Table 1: Phase-level project details for Knockduff wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2016[2] | 65 MW[3] | Onshore[3] | GLIL Infrastructure[4] | Nordex[3] |
Location
Table 2: Phase-level location details for Knockduff wind farm
Location | Coordinates (WGS 84) |
---|---|
Municipal District of Macroom, County Cork, Ireland[5] | 52.0379, -8.915 (exact)[6] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://medium.com/@bhoopiseo/nordex-strengthens-its-position-in-ireland-ca91fd4abeb6.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://invisenergy.com/assets-overview/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://www.evwind.es/2014/12/18/nordex-to-build-65-mw-wind-farm-in-ireland-with-26-n902500-wind-turbines/49511.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.glil.co.uk/media/glil-infrastructure-invests-in-irish-windfarm-portfolio.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.thewindpower.net/windfarm_en_2478.php.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.thewindpower.net/windfarm_en_24078.php.
{{cite web}}
: Missing or empty|title=
(help)