Kresna-Piperevo Gas Pipeline
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Kresna-Piperevo Gas Pipeline is a proposed gas pipeline in Bulgaria.[1]
Location
The pipeline is proposed to run from Kresna, Bulgaria, to Piperevo, Bulgaria.[2]
Project details
- Operator: Bulgartransgaz EAD[2]
- Owner: Bulgartransgaz EAD[2]
- Parent company: Bulgartransgaz EAD[2]
- Capacity:
- Length: 85 km[2]
- Diameter: 700 mm[2]
- Status: Proposed[1]
- Start year: 2029[1]
- Cost:
- Financing:
- Associated infrastructure:
Background
This proposed pipeline is part of the project designed to increase the capacity for natural gas transmission from Greece to Bulgaria at the Interconnection Point (IP) Kulata/Sidirokastro. The project has a baseline and extended option. The Kresna-Piperevo looping gas pipeline is proposed as an extended option, together with construction of the Ihtiman-Gorni Bogrov gas pipeline, expansion at CS Petrich, and reversal of CS Ihtiman, if there is enough economic interest. The total cost of the extended option is approximately 307.2 million EUR.[3]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 "2025-2034 Ten-Year Network Development Plan of Bulgartransgaz EAD" (PDF). Bulgartransgaz. April 2025. Retrieved September 25, 2025.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 "TYNDP 2024 Annex A1 - Project Tables". The European Network of Transmission System Operators for Gas (ENTSOG). 2024. Retrieved September 25, 2025.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "2025-2034 Ten-Year Network Development Plan of Bulgartransgaz EAD" (PDF). Bulgartransgaz. April 2025. Retrieved September 25, 2025.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas pipelines, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.