Kunming Steel Gas power project
From Global Energy Monitor
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Kunming Steel Gas power project (武钢集团昆明钢铁股份有限公司100MW亚临界发电机组能效提升项目) is a power station in pre-construction in Anning, Kunming, Yunnan, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Kunming Steel Gas power project | Anning, Kunming, Yunnan, China | 24.9541076, 102.3734122 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1: 24.9541076, 102.3734122
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| 1 | Pre-construction[1] | industrial by-product: blast furnace gas[1] | 100[1] | steam turbine[1] | not found | not found | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | Wugang Group Kunming Steel & Iron Co Ltd [100%][1] | China Baowu Steel Group Co Ltd [48.4%]; Kunming Iron & Steel Holding Co Ltd [40.3%]; unknown [4.2%] |
Project-level captive use details
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 http://www.kman.gov.cn/c/2025-01-22/6959505.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 "上海宝华国际招标有限公司(宝华智慧招标共享平台)". www.baohuabidding.com. 2024-11-28. Archived from the original on 2025-07-11. Retrieved 2025-07-06.
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.