Kuqa back-pressure power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Kuqa back-pressure power station (库车经济技术开发区背压机组) is a cancelled power station in Kuqa (Kuche), Aksu, Xinjiang, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Kuqa back-pressure power station | Kuqa (Kuche), Aksu, Xinjiang, China | 41.739051, 83.066795 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 41.739051, 83.066795
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Cancelled | coal: unknown[1] | 39 | unknown | yes | False |
| Unit 2 | Cancelled | coal: unknown[1] | 39 | unknown | yes | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Aksu Korong XingMao Energy Co Ltd [100%] | Kuqa Jingkai Industrial Group Co Ltd [100.0%] |
| Unit 2 | Aksu Korong XingMao Energy Co Ltd [100%] | Kuqa Jingkai Industrial Group Co Ltd [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): both
- Captive industry: Chemicals
Project-level coal details
- Coal source(s): domestic
- Permit(s): 新发改能源【2017】1209号
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Kuqa Back-Pressure power station is a power plant proposed by the Ningbo Thermal Power Company in 2020. It was included in a list of Xinjiang's 'key power projects,' which also listed nine other new thermal power projects.[2] The power plant, if constructed, will provide electricity to support the Kuqa Economic and Technological Development Zone Chemical Park, where it will be located.[2]
In June 2021, the company put out a bid for engineering supervisors for 84.5 million RMB, signaling that the project was still developing.[3][4]
As of June 2022, the units appeared under construction.[5] [6] [7]
Construction appeared to be suspended. The project was cancelled in June 2026.
Articles and Resources
References
- ↑ 1.0 1.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 "涉及83个电力能源项目!2020年新疆重点项目全名单发布 - 北极星火力发电网". BJX News. 2020-03-24. Retrieved 2021-08-04.
{{cite web}}: CS1 maint: url-status (link) - ↑ "库车经济技术开发区化工园2X39兆瓦背压机组工程(一标段)安装工程监理_招标资源网". hami.zhaobiaoziyuan.com. 2021-06-16. Retrieved 2021-08-04.
{{cite web}}: CS1 maint: url-status (link) - ↑ "库车经济技术开发区化工园2X39兆瓦背压机组工程(一标段)安装工程监理". zwfw.xinjiang.gov.cn. 2021-06-16. Retrieved 2021-08-04.
{{cite web}}: CS1 maint: url-status (link) - ↑ Company Profile, BJX, accessed in 2022
- ↑ 农发行阿克苏地区分行 获批4亿元让“温暖”与“蓝天”兼得, zhgnj.com, 2021-08-15
- ↑ 阿克苏科融星茂能源有限公司召开2022年度第二次项目建设工作进度会, 大名县思必达网络科技有限公司旗下网站, 2022-03-10
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.