Kurri Kurri power (Snowy Hydro) station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Kurri Kurri power (Snowy Hydro) station is a power station under construction in Kurri Kurri, Hunter Valley/Newcastle, New South Wales, Australia. It is also known as Hunter Valley power station, Hunter Power Project.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Kurri Kurri power (Snowy Hydro) station Kurri Kurri, Hunter Valley/Newcastle, New South Wales, Australia -32.79, 151.4808 (approximate)[1][2]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 construction[3][4][5][6] gas, diesel[1] 330[1][7] gas turbine[1] not found 2024[3][8][9][6][10] 2064 (planned)
Unit 2 construction[3][4][5][6] gas, diesel[1] 330[1][7] gas turbine[1] not found 2024[3][8][9][6][10] 2064 (planned)

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Snowy Hydro Limited[1][11] Snowy Hydro Limited [100.0%]
Unit 2 Snowy Hydro Limited[1][11] Snowy Hydro Limited [100.0%]

Background

Originally purported to begin operations with hydrogen, in November 2022 the chairman of Snowy Hydro admitted the plant would be running fully on natural gas once operational.[12] The challenge of running the plant fully on hydrogen led to the departure of the former CEO in August 2022.[13] As of November 2022, the timeline for the plant to run on hydrogen was unclear.[14] An additional investment of up to $700 million is envisaged by Snowy’s owner, the Commonwealth government, as part of its pre-election pledge to have the generator run on 30 per cent green hydrogen at the outset, which is subject to a business case still being worked up by Snowy Hydro that is due to go to government before the 2024 federal budget[15].

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://web.archive.org/web/20221107004658/http://www.snowyhydro.com.au/hunter-power-project/. Archived from the original on 07 November 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://www.google.com/maps/place/Hydro+Aluminium+Kurri+Kurri+Pty+Ltd/@-32.7869611151.47987822507m/data=!3m1!1e3!4m12!1m6!3m5!1s0x6b73482f1242f97d:0xa15f0732a8abb787!2sHydro+Aluminium+Kurri+Kurri+Pty+Ltd!8m2!3d-32.7909137!4d151.4809232!3m4!1s0x6b73482f1242f97d:0xa15f0732a8abb787!8m2!3d-32.7909137!4d151.4809232. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20210920191959/https://www.power-technology.com/news/australia-unveils-alternative-energy-plans-liddell-power-station/. Archived from the original on 20 September 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20220928170846/https://www.afr.com/companies/energy/kurri-kurri-gas-plant-gets-all-clear-but-doubts-remain-20211221-p59j82. Archived from the original on 28 September 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20230118081305/https://reneweconomy.com.au/unknown-uncertain-uncosted-snowy-gets-grilling-on-kurri-kurri-green-hydrogen/. Archived from the original on 18 January 2023. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://web.archive.org/web/20230514142034/https://www.afr.com/companies/energy/new-snowy-ceo-can-t-rule-out-further-delays-at-projects-20230213-p5cjzr. Archived from the original on 14 May 2023. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 (PDF) https://web.archive.org/web/20230317061131/https://aemo.com.au/-/media/files/stakeholder_consultation/consultations/nem-consultations/2022/2023-inputs-assumptions-and-scenarios-consultation/supporting-materials-for-2023/aurecon-2022-cost-and-technical-parameter-review.pdf?la=en. Archived from the original (PDF) on 17 March 2023. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 "Australian Energy Market Operator, NEM (National Electricity Market) Generation information, October 2022". Archived from the original on 44948. Retrieved October 20, 2022. {{cite web}}: Check date values in: |archive-date= (help)
  9. 9.0 9.1 https://web.archive.org/web/20221104113903/https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information. Archived from the original on 04 November 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. 10.0 10.1 (PDF) https://web.archive.org/web/20230507022750/https://aemo.com.au/-/media/files/electricity/nem/planning_and_forecasting/nem_esoo/2023/february-2023-update-to-the-2022-esoo.pdf?la=en&hash=1AED91846C35DE3DE0BFC071A2228EAD. Archived from the original (PDF) on 07 May 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20221001204955/https://www.abc.net.au/news/2021-04-29/government-gas-fired-power-plant-nsw/100102888. Archived from the original on 01 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  12. "No green hydrogen for Kurri Kurri on start-up: Snowy". Australian Financial Review. 2022-11-07. Retrieved 2022-12-08.
  13. "Snowy Hydro CEO in shock exit amid hit from crisis". Australian Financial Review. 2022-08-26. Retrieved 2022-12-08.
  14. https://web.archive.org/web/20230118081305/https://reneweconomy.com.au/unknown-uncertain-uncosted-snowy-gets-grilling-on-kurri-kurri-green-hydrogen/. {{cite web}}: |archive-url= requires |archive-date= (help); Missing or empty |title= (help)
  15. "New Snowy CEO can't rule out further delays at projects". Financial Review. February 13, 2023. Retrieved May 16, 2023.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.