Kutch Welspun power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Kutch Welspun power station is an operating power station of at least 123-megawatts (MW) in Versamedi, Anjar, Kutch, Gujarat, India.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Kutch Welspun power station | Versamedi, Anjar, Kutch, Gujarat, India | 23.1175, 70.0822 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 23.1175, 70.0822
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | Operating | coal: unknown | 43 | subcritical | 2007 |
Unit 2 | Operating | coal: unknown | 80 | subcritical | 2012 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Welspun Captive Power Generation Ltd [100%] | Welspun India Ltd [77.0%]; unknown [23.0%] |
Unit 2 | Welspun Captive Power Generation Ltd [100%] | Welspun India Ltd [77.0%]; unknown [23.0%] |
Project-level captive use details
- Captive industry use (heat or power): power
- Captive industry: Iron & Steel
Background
WCGPL is a captive power plant of 123 MW operating in Welspun city, Anjar, Bhuj Dist., Gujarat, supplying power to Welspun Group companies.[1] In August 2007, Environmental Clearance (EC) was granted to Welspun to establish a 123 MW captive power plant. A 43 MW was reportedly operational by September 2007.[2] An 80 MW unit appeared to be operating around 2012-13.[3]
The EC was formally split between two units in January 2012:
- 43 MW CPP in the name of M/s. Welspun Corp Ltd (WCL)
- 80 MW CPP in the name of M/s. Welspun Captive Power Generation Limited (WCPGL), under the Welspun Group Company[4]
In March 2019, WCL announced divestment of the 43 MW unit and WCPGL completed the acquisition in 2020.[5]
In March 2022 and July 2022, the Thermal Expert Appraisal Committee considered and approved a formal proposal to transfer the Environmental Clearance of the 43 MW unit from M/s Welspun Corp Ltd to M/s Welspun Captive Power Generation Ltd.[4][6]
Articles and Resources
References
- ↑ Welspun-Kutch-Thermal-Power-Plant, Infraline
- ↑ 16th Annual Report, Welspun Corp, 2010-11
- ↑ Welspun India’s expansion plans on track, Indian Textile Magazine, June 1, 2013
- ↑ 4.0 4.1 Minutes Of The 22nd Meeting Of The Re-Constituted Expert Appraisal Committee (Eac) On Environmental Impact Assessment (EIA) Of Thermal Power Projects, MOEF, held March 14, 2022
- ↑ Welspun Captive Power Generation Limited, CARE Ratings Press Release, March 26, 2021
- ↑ Minutes Of The 27th Meeting Of The Re-Constituted Expert Appraisal Committee (Eac) On Environmental Impact Assessment (EIA) Of Thermal Power Projects, MOEF, held July 1, 2022
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.