Kwekwe Indarama power station is an announced power station in Kwekwe, Midlands, Zimbabwe.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Kwekwe Indarama power station | Kwekwe, Midlands, Zimbabwe | -18.833734, 29.769366 (approximate)[1] |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Emergency/Backup |
|---|---|---|---|---|---|
| Unit 1 | Announced[1] | coal: unknown[1] | 300[1] | unknown | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Huoyuntong Investments Pvt Ltd [100%][1] | Huoyuntong Investments Pvt Ltd [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
According to reporting from May 2025, Huoyuntong Investments (Private) Limited had applied to the Zimbabwe Energy Regulatory Authority (ZERA) to build and operate a 300 MW coal-fired power station at the Indarama gold mine in Kwekwe, Midlands Province. The proposed power station was expected to supply power to the national grid.[2][3]
As of May 2026, there were no apparent developments related to the proposed power station.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://www.heraldonline.co.zw/zimbabwe-set-for-300mw-coal-power-plant-boost/.
{{cite web}}: Missing or empty|title=(help) - ↑ “Zimbabwe set for 300MW coal power plant boost,” The Chronicle, May 19, 2025
- ↑ “Zimbabwe Set for 300MW Coal Power Plant Boost Amidst Regional Energy Gap,” Energy & Power Insider, May 20, 2025
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.