Kyzylorda CHP power station (ТЭЦ в Кызылорде) is a power station under construction in Kyzylorda, Kazakhstan.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Kyzylorda CHP power station Kyzylorda, Kyzylorda, Kazakhstan 44.865748, 65.45722 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit CC1, Unit CC2: 44.865748, 65.45722

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit CC1 construction[2][3][4][5][6][7] gas[8] 120[2][5][8] combined cycle[2][8] yes[9][8][10] 2025[4][11][6][7]
Unit CC2 construction[7] gas[8] 120[8] combined cycle[8] yes[8][10] 2025[7]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit CC1 Financial Settlement Center of Renewable Energy LLP[9] Kazakhstan Electricity Grid Operating Company (KEGOC)
Unit CC2 Financial Settlement Center of Renewable Energy LLP[9] Kazakhstan Electricity Grid Operating Company (KEGOC)

Background

Residents of Kyzylorda have been complaining about frequent blackouts in their homes for several years. The reason is the lack of electricity and the worn out networks. The city thermal power plant, built 60 years ago, today is not able to provide electricity to the residents of the region. To remedy the situation, local authorities, together with foreign investors, intend to build a new Kyzylorda CHP power station. This will be the first energy project in the country implemented through foreign investments. The cost of the project is 215 billion tenge (456.5 million USD). The new facility will be built on an area of more than 3.5 hectares. It is planned that the production capacity of the new center will be 277 gigacalories of heat and 240 megawatts of electricity.[12]

Aksa Energy, a Turkish company, celebrated the 15-year capacity agreement of Kyzylorda combined heat and power plant with an official ceremony held at the plant site in July 2022.[13]

In September 2022, a commemorative capsule was laid at the plant site dedicated to the start of construction.[14] In February 2023, Aksa Energy and Siemens signed a contract for the supply of two highly-efficient GE 6F.03 gas turbines. The power station is expected to become operational in 2025[15]. In October 2023, the foundation for a new thermal power plant was laid in the city of Kyzylorda.[16]

In January 2024, engineering preparation of construction site was in progress.[17] The project was included into the "Electric Power Industry Development Plan until 2035", released by the Ministry of Energy of Kazakhstan in February 2024, with the start year in 2026.[18]

Articles and Resources

References

  1. https://www.google.com/maps/place/Gkp+%22Ktets%22/@44.865638465.4586539792m/data=!3m1!1e3!4m5!3m4!1s0x41f7fd11d7b95f1b:0x33e37770c4da9c50!8m2!3d44.8671478!4d65.4558322. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20210702225421/https://internews.press/eng-news/nurlan-nogaev-arrived-in-kyzylorda-region-on-a-working-visit/. Archived from the original on 02 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. https://web.archive.org/web/20210702223333/https://gratanet.com/employees/marina-kahiani/experience. Archived from the original on 02 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20221130235642/https://informburo.kz/novosti/prezident-poruchil-pristupit-k-stroitelstvu-novoj-parogazovoj-ustanovki-na-almatinskoj-tec-2. Archived from the original on 30 November 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20220709172932/https://www.gov.kz/uploads/2022/5/20/6cf59d2d22f7e15d80e44cdc95cb7f0f_original.4128686.DOCX. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20221101040403/https://www.inform.kz/en/turkish-company-to-build-thermal-power-plant-in-kyzylorda_a3976628. Archived from the original on 01 November 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 https://ru.sputnik.kz/20231025/v-kyzylorde-nachali-stroit-novuyu-tets-stoimostyu-215-mlrd-tenge-39641924.html https://www.ge.com/news/press-releases/ges-gas-turbines-will-power-the-first-combined-heat-and-power-plant-in-kazakhstan; https://ru.sputnik.kz/20231025/v-kyzylorde-nachali-stroit-novuyu-tets-stoimostyu-215-mlrd-tenge-39641924.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 https://web.archive.org/web/20230330054137/https://www.ge.com/news/press-releases/ges-gas-turbines-will-power-the-first-combined-heat-and-power-plant-in-kazakhstan. Archived from the original on 30 March 2023. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://web.archive.org/web/20220927002613/https://www.ktez.kz/%D0%B8%D1%81%D1%82%D0%BE%D1%80%D0%B8%D1%8F_%D1%80%D1%83.html. Archived from the original on 27 September 2022. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://web.archive.org/web/20230330010020/https://www.power-technology.com/news/ge-gas-turbine-contract/. Archived from the original on 30 March 2023. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20220526144919/https://kea.kz/article/sovet-rynka-napravil-v-ministerstvo-energetiki-rk-rekomendacii-po-investicionnym-programmam-energoproizvodyashchih-organizacij. Archived from the original on 26 May 2022. {{cite web}}: Missing or empty |title= (help)
  12. "Новую ТЭЦ стоимостью 215 млрд тенге построят в Кызылорде - Новости Казахстана и мира на сегодня" (in русский). Retrieved 2022-12-07.
  13. "AKSA Enerji | The biggest energy investment of Uzbekistan has started its operations". www.aksaenerji.com.tr. Retrieved 2022-11-16.
  14. https://web.archive.org/web/20221101040403/https://www.inform.kz/en/turkish-company-to-build-thermal-power-plant-in-kyzylorda_a3976628. {{cite web}}: |archive-url= requires |archive-date= (help); Missing or empty |title= (help)
  15. "GE's gas turbines will power the first combined heat and power plant in Kazakhstan, supporting country's energy transition journey". GE. February 9,2023. Retrieved April 24, 2023. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  16. "В Кызылорде начали строить новую ТЭЦ стоимостью 215 млрд тенге". Sputnik Kazakhstan. October 25, 2023. Retrieved October 31, 2023.{{cite web}}: CS1 maint: url-status (link)
  17. "ТОО "AKSA Energy Qyzylorda" (Акса Энерджи Кызылорда)". www.gov.kz. January 26, 2024. Retrieved April 5, 2024.{{cite web}}: CS1 maint: url-status (link)
  18. "Приказ "Об утверждении Плана мероприятий по развитию электроэнергетической отрасли до 2035 года"". www.gov.kz. February 20, 2024. Retrieved April 5, 2024.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.