La Atalaya solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
La Atalaya solar farm (Planta solar CSF La Atalaya) is a solar photovoltaic (PV) farm in pre-construction in Villena, Alacant / Alicante, Valencian Community, Spain.
Project Details
Table 1: Phase-level project details for La Atalaya solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 96.9 MWac[2] | PV[3] | X-Elio [100%][3] | Mursolar 14[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for La Atalaya solar farm
Location | Coordinates (WGS 84) |
---|---|
Villena, Alacant / Alicante, Valencian Community, Spain[5] | 38.6241, -0.8834 (approximate)[5] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10543, https://www.pv-magazine.es/2022/08/22/x-elio-desarrollara-en-alicante-el-parque-la-atalaya-de-120-mwp-con-una-inversion-cercana-a-100-millones-de-euros/ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-13368, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10543, https://www.pv-magazine.es/2022/08/22/x-elio-desarrollara-en-alicante-el-parque-la-atalaya-de-120-mwp-con-una-inversion-cercana-a-100-millones-de-euros/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ "BOE-A-2023-10543 Resolución de 18 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Mursolar 14, SL, autorización administrativa previa para la instalación fotovoltaica CSF La Atalaya, de 96,884 MW de potencia instalada". Boletín Oficial del Estado. 2023-05-01. Archived from the original on 2024-03-20. Retrieved 2024-02-14.
- ↑ 3.0 3.1 https://web.archive.org/web/20240201222815/https://www.pv-magazine.es/2022/08/22/x-elio-desarrollara-en-alicante-el-parque-la-atalaya-de-120-mwp-con-una-inversion-cercana-a-100-millones-de-euros/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10543 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-13368, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10543.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://www.pv-magazine.es/2022/08/22/x-elio-desarrollara-en-alicante-el-parque-la-atalaya-de-120-mwp-con-una-inversion-cercana-a-100-millones-de-euros/ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10543, https://www.pv-magazine.es/2022/08/22/x-elio-desarrollara-en-alicante-el-parque-la-atalaya-de-120-mwp-con-una-inversion-cercana-a-100-millones-de-euros/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)