La Cima solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
La Cima solar farm (Planta solar fotovoltaica La Cima) is a solar photovoltaic (PV) farm in pre-construction in Méntrida, Toledo, Castilla-La Mancha, Spain.
Project Details
Table 1: Phase-level project details for La Cima solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 149.8 MWp/dc[2] | PV[3] | Viridi RE [100%][3] | Progresión Dinámica[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for La Cima solar farm
Location | Coordinates (WGS 84) |
---|---|
Méntrida, Toledo, Castilla-La Mancha, Spain[2] | 40.2349, -4.1822 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2920 https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2920.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 "BOE-A-2023-2920 Resolución de 23 de enero de 2023, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula la declaración de impacto ambiental del proyecto «Plantas fotovoltaicas PSF "El Valle", de 125 MW, PSF "La Cima", de 150 MW, PSF "El Monte" de 150 MW y PSF "La Ladera", de 7 MW»". Boletín Oficial del Estado. 2023-02-03. Archived from the original on 2024-04-09. Retrieved 2024-03-22.
- ↑ 3.0 3.1 "Cepsa, Iberdrola y Solaria son las empresas que más potencia fotovoltaica presentaron en 2022". Energía Estratégica España. 2023-01-03. Archived from the original on 2024-02-01.