La Luz solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
La Luz solar farm (Parque Solar La Luz) is an operating solar photovoltaic (PV) farm in La Carrascosa, Huelva, Andalucía, Spain.
Project Details
Table 1: Phase-level project details for La Luz solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2024[1] | 49.9 MWp/dc[2] | PV[3] | Alter Enersun SA [100%][3] |
2 | Operating[1] | 2024[1] | 49.9 MWp/dc[4] | PV[3] | Alter Enersun SA [100%][3] |
3 | Operating[1] | 2024[1] | 22.5 MWp/dc[5] | PV[3] | Alter Enersun SA [100%][3] |
4 | Mothballed[1] | 2024[1] | 22.5 MWp/dc[6] | PV[3] | Alter Enersun SA [100%][3] |
5 | Mothballed[1] | – | 22.5 MWp/dc[7] | PV[3] | Alter Enersun SA [100%][3] |
6 | Mothballed[8] | – | 22.5 MWp/dc[9] | PV[3] | Alter Enersun SA [100%][3] |
7 | Mothballed[8] | – | 21.1 MWp/dc[10] | PV[3] | Alter Enersun SA [100%][3] |
8 | Mothballed[8] | – | 9.9 MWp/dc[11] | PV[3] | Alter Enersun SA [100%][3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for La Luz solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | La Carrascosa, Huelva, Andalucía, Spain[12] | 37.3230, -6.8988 (exact)[12] |
2 | La Carrascosa, Huelva, Andalucía, Spain[12] | 37.3230, -6.8988 (exact)[12] |
3 | La Carrascosa, Huelva, Andalucía, Spain[12] | 37.3230, -6.8988 (exact)[12] |
4 | La Carrascosa, Huelva, Andalucía, Spain[12] | 37.3230, -6.8988 (exact)[12] |
5 | La Carrascosa, Huelva, Andalucía, Spain[12] | 37.3230, -6.8988 (exact)[12] |
6 | La Carrascosa, Huelva, Andalucía, Spain[12] | 37.3230, -6.8988 (exact)[12] |
7 | La Carrascosa, Huelva, Andalucía, Spain[12] | 37.3230, -6.8988 (exact)[12] |
8 | La Carrascosa, Huelva, Andalucía, Spain[12] | 37.3230, -6.8988 (exact)[12] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://www.alterenersun.com/en/alter-enersun-completes-works-parque-solar-laluz-in-huelva/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-39031 https://www.juntadeandalucia.es/sites/default/files/2020-12/PE%20LA%20LUZ%20I%20COMPLETO%20v2.pdf, https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-39031.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 "Alter Enersun finaliza las obras del Parque Solar La LUZ en Huelva". Alter Enersun. 2024-03-04. Archived from the original on 2024-04-01. Retrieved 2024-03-07.
- ↑ (PDF) https://www.juntadeandalucia.es/sites/default/files/2020-12/20200520_Proyecto%20Ejecuci%C3%B3n_LA%20LUZ%20II.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "PROYECTO EJECUCIÓN PLANTA SOLAR FOTOVOLTAICA "LA LUZ III" DE 22,5 MWp TÉRMINO MUNICIPAL DE HUELVA" (PDF). Alter Enersun. 2020-11-05. Archived from the original (PDF) on 2024-04-01.
- ↑ "ESTUDIO DE IMPACTO AMBIENTAL PARA LA OBTENCIÓN DE LA AUTORIZACIÓN AMBIENTAL UNIFICADA ABREVIADA PLANTA SOLAR FOTOVOLTAICA "LA LUZ IV" DE 22,5 MWp. TÉRMINO MUNICIPAL DE HUELVA, HUELVA" (PDF). Alter Enersun. 2020-11-09. Archived from the original (PDF) on 2024-04-01.
- ↑ "ESTUDIO DE EFECTOS SINÉRGICOS Y ACUMULATIVOS PROYECTO DE PSF "CAMPOS DEL CONDADO II" DE POTENCIA 43,54 MWp Y SU INFRAESTRUCTURA DE EVACUACIÓN" (PDF). Gabitel Soluciones Técnicas. 2021-07-31. Archived from the original (PDF) on 2024-04-01.
- ↑ 8.0 8.1 8.2 http://www.alterenersun.com/alter-enersun-finaliza-las-obras-del-parque-solar-la-luz-en-huelva/ https://www.pv-magazine.es/2023/12/19/alter-enersun-desarrolla-1-gw-fotovoltaico-y-eolico-para-suministrar-a-la-red-y-a-los-proyectos-de-hidrogeno-de-huelva/, http://www.alterenersun.com/alter-enersun-finaliza-las-obras-del-parque-solar-la-luz-en-huelva/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ "PROYECTO EJECUCIÓN PLANTA SOLAR FOTOVOLTAICA "LA LUZ VI" DE 22,5 MWp TÉRMINO MUNICIPAL DE HUELVA" (PDF). Alter Enersun. 2020-11-05. Archived from the original (PDF) on 2024-04-01.
- ↑ "PROYECTO EJECUCIÓN PLANTA SOLAR FOTOVOLTAICA "LA LUZ VII" DE 21,05 MWp TÉRMINO MUNICIPAL DE HUELVA" (PDF). Alter Enersun. 2020-11-05. Archived from the original (PDF) on 2024-04-01.
- ↑ "PROYECTO EJECUCIÓN PLANTA SOLAR FOTOVOLTAICA "LA LUZ VIII" DE 9,92 MWp TÉRMINO MUNICIPAL DE HUELVA" (PDF). Alter Enersun. 2020-11-05. Archived from the original (PDF) on 2024-04-01.
- ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 12.14 12.15 https://maps.app.goo.gl/bL7Na1u5mT1PzD7j7 http://www.alterenersun.com/alter-enersun-finaliza-las-obras-del-parque-solar-la-luz-en-huelva/, https://maps.app.goo.gl/bL7Na1u5mT1PzD7j7.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)