Labraza wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Labraza wind farm is a wind farm in pre-construction in Oion, Araba, País Vasco, Spain.
Project Details
Table 1: Phase-level project details for Labraza wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2025 (planned)[2] | 40 MW[3] | Onshore[3] | Aixeindar SA [100%][3] | Aixeindar[3] |
Location
Table 2: Phase-level location details for Labraza wind farm
Location | Coordinates (WGS 84) |
---|---|
Oion, Araba, País Vasco, Spain[3] | 42.5066, -2.4358 (approximate)[3] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-1850, https://www.elcorreo.com/alava/araba/parque-eolico-labraza-funcionara-2024-primero-euskadi-20230504010544-nt_amp.html, https://www.elcorreo.com/alava/araba/parques-eolicos-labraza-azazeta-reciben-visto-bueno-declaracion-impacto-ambiental-20230117133350-nt.html https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-15109, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-1850, https://www.elcorreo.com/alava/araba/parque-eolico-labraza-funcionara-2024-primero-euskadi-20230504010544-nt_amp.html, https://www.elcorreo.com/alava/araba/parques-eolicos-labraza-azazeta-reciben-visto-bueno-declaracion-impacto-ambiental-20230117133350-nt.html.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://cronicavasca.elespanol.com/empresas/20240106/azazeta-labraza-serviran-termometro-social-marcaran-despliegue/820918018_0.html https://www.elcorreo.com/alava/araba/diputacion-alava-luz-parque-eolico-azaceta-falta-20230731174251-nt_amp.html, https://cronicavasca.elespanol.com/empresas/20240106/azazeta-labraza-serviran-termometro-social-marcaran-despliegue/820918018_0.html.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20240126042714/https://www.eve.eus/Jornadas-y-Noticias/Noticias/Aixeindar-inicia-la-tramitacion-de-sus-primeros-cu. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help)