LafargeHolcim Maroc Oujda Cement Plant
| This article is part of the Global Cement and Concrete Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
LafargeHolcim Maroc Oujda Cement Plant (مصنع الإسمنت لافارج هولسيم وجدة), also known as Oujda Cement Plant, is an integrated cement plant operating in Oujda, Oriental, Morocco.
Location
The map below shows the exact location of the cement plant in Oujda, Oriental, Morocco[1]:
Coordinates (WGS 84): 34.595314, -2.346988 (exact)[2]
Background
The Oujda Cement Plant started operation in 1979, with an annual capacity on 1.2 million tonnes of cement.[3] It was originally planned to be a joint venture supported by both the Moroccan and Algerian governments, but the Algerian side withdrew before opening. In 2002, the plant was acquired by Holcim, later merged into Lafarge Holcim.[4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Cement Plant Details
Table 1: General Plant Details
| Plant type | Plant status | Start date |
|---|---|---|
| integrated[1] | operating[1] | 1979-01[5] |
Table 2: Ownership Details
| Parent company | Parent company GEM ID | Owner name | Owner company GEM ID |
|---|---|---|---|
| LafargeHolcim Maroc SA [100.0%] | E100002006206 [100.0%] | LafargeHolcim Maroc SA [100.0%][6] | E100002006206 [100.0%] |
Table 3: Capacities (million metric tonnes per annum)
| Cement capacity | Clinker capacity |
|---|---|
| 1.20[5] | unknown |
Table 4: Cement Production (million metric tonnes per annum)
| Primary cement color | Primary cement type | Clinker substitution rate | 2024 -2025 Cement production |
|---|---|---|---|
| grey[7] | blended[7] | unknown | unknown |
Table 5: Clinker Production
| Clinker production method | Number of operating kilns (accuracy) | Number of developing kilns (accuracy) | Kiln technology - preheater | Kiln technology - precalciner | Kiln technology - waste heat recovery |
|---|---|---|---|---|---|
| dry[8] | 1 (exact)[8] | unknown | yes[8] | unknown | unknown |
Table 6: Green Cement Technology
| CCS/CCUS | Alternative fuel | Clay calcination |
|---|---|---|
| no | yes; unknown[9] | no |
Articles and Resources
Additional data
To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://www.lafargeholcim.ma/fr/Implantation.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.google.com/maps/@34.59557;-2.3494687;1055m/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI0MDkyOS4wIKXMDSoASAFQAw%3D%3D.
{{cite web}}: Missing or empty|title=(help) - ↑ "Rapport sur la CIOR et son développement | PDF | Maroc | Ciment". www.scribd.com. Retrieved 2026-03-04.
- ↑ "Étude sur la régularité du cru au clinker | PDF | Ciment | Matériaux". www.scribd.com. Retrieved 2026-03-04.
- ↑ 5.0 5.1 https://www.scribd.com/document/17717474/cior-ciment.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.lafargeholcim.ma/fr/contacts.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://www.lafargeholcim.ma/fr/fondation-et-structure.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 8.2 https://www.scribd.com/document/576522225/l-Etude-de-La-Regularite-de-La-Matiere-Du-Cru-Au-Clinker.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.lafargeholcim.ma/fr/la-nouvelle-cimenterie-agadir-souss-est-operationnelle.
{{cite web}}: Missing or empty|title=(help)
