LafargeHolcim Maroc Tangier Cement Plant
| This article is part of the Global Cement and Concrete Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
LafargeHolcim Maroc Tangier Cement Plant (مصنع إسمنت لافارج هولسيم طنجة) is a grinding cement plant operating in Tangier, Tanger-Tetouan-Al Hoceima, Morocco.
Location
The map below shows the exact location of the cement plant in Tangier, Tanger-Tetouan-Al Hoceima, Morocco[1]:
Coordinates (WGS 84): 35.655133, -5.915322 (exact)[2]
Background
The Tangier Cement Plant started operation as a grinding plant in 1954 with a capacity of half a million tonnes. By 1994 it had been acquired by Lafarge, now merged into Lafarge Holcim, and around 2008 it's capacity was doubled to 1 million tonnes annually.[3][4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Cement Plant Details
Table 1: General Plant Details
| Plant type | Plant status | Start date |
|---|---|---|
| grinding[1] | operating[1] | 1954[5] |
Table 2: Ownership Details
| Parent company | Parent company GEM ID | Owner name | Owner company GEM ID |
|---|---|---|---|
| LafargeHolcim Maroc SA [100.0%] | E100002006206 [100.0%] | LafargeHolcim Maroc SA [100.0%][6] | E100002006206 [100.0%] |
Table 3: Capacities (million metric tonnes per annum)
| Cement capacity | Clinker capacity |
|---|---|
| 1.00[7] | – |
Table 4: Cement Production (million metric tonnes per annum)
| Primary cement color | Primary cement type | Clinker substitution rate | 2024 -2025 Cement production |
|---|---|---|---|
| grey[8] | blended[8] | unknown | unknown |
Table 5: Clinker Production
| Clinker production method | Number of operating kilns (accuracy) | Number of developing kilns (accuracy) | Kiln technology - preheater | Kiln technology - precalciner | Kiln technology - waste heat recovery |
|---|---|---|---|---|---|
| – | – | unknown | unknown | unknown | unknown |
Table 6: Green Cement Technology
| CCS/CCUS | Alternative fuel | Clay calcination |
|---|---|---|
| – | – | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://www.lafargeholcim.ma/fr/Implantation.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.google.com/maps/@35.655292;-5.9168723;619m/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI0MDkzMC4wIKXMDSoASAFQAw%3D%3D.
{{cite web}}: Missing or empty|title=(help) - ↑ "Rapport de stage chez Lafarge Ciments | PDF | Ciment | Secteurs de l'économie". www.scribd.com. Retrieved 2026-03-04.
- ↑ "Lafarge-Maroc lance la plus grande cimenterie du royaume". Le Moniteur.
{{cite web}}: CS1 maint: url-status (link) - ↑ https://www.scribd.com/document/427614468/kjgjkklk.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.lafargeholcim.ma/fr/contacts.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.lemoniteur.fr/article/lafarge-maroc-lance-la-plus-grande-cimenterie-du-royaume.1273494.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 https://www.lafargeholcim.ma/fr/fondation-et-structure.
{{cite web}}: Missing or empty|title=(help)
