Lagerdorf Cement Plant
This article is part of the Global Cement and Concrete Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Lagerdorf Cement Plant (Lagerdorf Zementwerk) is an integrated cement plant operating in Rethwisch, Schleswig-Holstein, Germany.
Location
The map below shows the exact location of the cement plant in Rethwisch, Schleswig-Holstein, Germany[1]:
Coordinates (WGS 84): 53.875352, 9.584225 (exact)[2]
Background
In 2024 owner Holcim broke ground on a new kiln line and CO2 processing unit at its Lägerdorf cement plant. The line will include an OxyFuel kiln, and is predicted to capture 1.2 million tonnes per year of CO2 from the plant, nearly 100% of the plants carbon emissions. The new line is expected to be operational by 2029.
Cement Plant Details
Table 1: General Plant Details
Plant type | Plant status | Start date |
---|---|---|
integrated[3] | Operating[1] | 1862[3] |
Table 2: Ownership Details
Parent company | Parent company GEM ID | Owner name | Owner company GEM ID |
---|---|---|---|
Holcim AG [100.0%] | E100001000571 [100.0%] | Holcim (Deutschland) GmbH [100.0%] (Holcim Deutschland AG (German) [100%])[3] | E100002006800 [100.0%] |
Table 3: Capacities
Cement capacity (million metric tonnes per annum) | Clinker capacity (million metric tonnes per annum) | Unspecified capacity (million metric tonnes per annum) |
---|---|---|
1.31[3] | 1.46[3] | – |
Table 4: Cement Production
Primary cement color | Primary cement type | Production type | Green cement technology |
---|---|---|---|
grey[4] | blended[4] | dry[3] | Carbon capture, utilization, and/or storage [5]; Alternative fuels [6] |
Articles and Resources
Additional data
To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20250215004357/https://www.holcim.de/ueber-uns/standorte/zementwerk-laegerdorf. Archived from the original on 15 February 2025.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.google.com/maps/place/53%C2%B052'31.3%22N+9%C2%B035'03.2%22E/@53.875355;9.5816503;898m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d53.8753519!4d9.5842252?entry=ttu.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://www.holcim.de/ueber-uns/standorte/zementwerk-laegerdorf/zementproduktion-in-laegerdorf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://www.holcim-sued.de/de/produkte-loesungen/zement.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.globalcement.com/news/item/17273-holcim-deutschland-and-thyssenkrupp-break-ground-on-laegerdorf-cement-plant-carbon-neutralisation-project.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.globalcement.com/news/item/11942-holcim-deutschland-signs-deal-for-30-000mwh-of-offshore-wind-power-for-cement-plants.
{{cite web}}
: Missing or empty|title=
(help)