Lahad Datu Sabah LNG Terminal
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Lahad Datu Sabah LNG Terminal is a cancelled (confirmed) LNG import terminal in Malaysia.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Lahad Datu Sabah LNG Terminal | Lahad Datu, Tawau, Sabah, Malaysia[1] | 5.03, 118.34 (approximate) |
The map below shows the approximate location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Lahad Datu Sabah LNG Terminal | import[2] | cancelled (confirmed)[2] | 0.76 mtpa[2] | 0.76 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Lahad Datu Sabah LNG Terminal | import[2] | US$241,000,000[2] | US$241,000,000 |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Lahad Datu Sabah LNG Terminal | import[2] | cancelled (confirmed)[2] | – | – | – | – | 2016 (cancelled)[3] |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Lahad Datu Sabah LNG Terminal | import[2] | cancelled (confirmed)[2] | Sabah Energy [20%]; Petroliam Nasional Bhd [80%][4][4] | Petroliam Nasional Bhd [80.0%]; Sabah Energy [20.0%] | – |
Background
Lahad Datu Sabah LNG Terminal was a proposed LNG terminal in Sabah, Malaysia. It was to supply gas to an adjacent 300-megawatt combined cycle power plant, with capacity of 0.76 mtpa. An agreement for the terminal was made in 2012 by Petronas and Sabah Energy, with operation planned for 2015.[5]
Petronas announced that the project was put on hold after the territorial conflict known as the Lahad Datu armed intrusion or Lahad Datu territorial standoff, in February 2013. In 2016 the project was called off, due to "prolonged uncertainty," according to the project sponsors.[6]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ https://www.google.com/maps/place/5%C2%B001'48.0%22N+118%C2%B020'24.0%22E/@5.03,118.3374197,1279m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d5.03!4d118.34?entry=ttu&g_ep=EgoyMDI1MDgxOS4wIKXMDSoASAFQAw%3D%3D.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 http://www.hydrocarbons-technology.com/news/newspetronas-and-sabah-terminate-plans-for-241m-lng-terminal-in-sabah-4807760.
{{cite web}}: Missing or empty|title=(help) - ↑ http://www.hydrocarbons-technology.com/news/newspetronas-and-sabah-terminate-plans-for-241m-lng-terminal-in-sabah-4807760 http://www.hydrocarbons-technology.com/news/newspetronas-and-sabah-terminate-plans-for-241m-lng-terminal-in-sabah-4807760; http://www.hydrocarbons-technology.com/news/newspetronas-and-sabah-terminate-plans-for-241m-lng-terminal-in-sabah-4807760.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 4.0 4.1 https://www.offshore-technology.com/news/newspetronas-and-sabah-terminate-plans-for-241m-lng-terminal-in-sabah-4807760/.
{{cite web}}: Missing or empty|title=(help) - ↑ Lahad Datu Sabah LNG Terminal, A Barrel Full, accessed April 2017
- ↑ "Petronas and Sabah terminate plans for $241m LNG terminal in Sabah," Hydrocarbons Technology, Feb 11, 2016