Laibin Sanjiangkou Industrial Park cogen power station (来宾市三江口节能环保生态产业园热电联产项目) is a power station under construction in Xiangzhou Town, Laibin, Guangxi, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Laibin Sanjiangkou Industrial Park cogen power station Xiangzhou Town, Laibin, Guangxi, China 23.822385, 109.50682 (approximate)

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 2 construction[1] coal - unknown 40 circulating fluidized bed 2023
Phase III Unit 3 construction coal - unknown 40 circulating fluidized bed
Phase III Unit 4 construction coal - unknown 40 circulating fluidized bed

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 2 Guangxi Laibin Yajule Energy Saving and Environmental Protection Technology Co Ltd [100.0%]
Phase III Unit 3 Guangxi Laibin Yajule Energy Saving and Environmental Protection Technology Co Ltd [100.0%]
Phase III Unit 4 Guangxi Laibin Yajule Energy Saving and Environmental Protection Technology Co Ltd [100.0%]

Project-level coal details

  • Permit(s): October 28, 2019 – 桂发改电力〔2019〕1016号[2], October 28, 2019 – 桂发改电力〔2019〕1016号

Background

Laibin Sanjiangkou Industrial Park cogen power station was first granted permission (桂发改电力〔2019〕1016号) to build on 28 October 2019 but construction was delayed and the extension permission was granted by the Development and Reform Commission of Guangxi Zhuang Autonomous Region (桂发改电力〔2021〕948号). The project contains 1 x 130t/h high temperature and pressure CFB boiler+1 x 20 MW back-pressure steam turbine and 4 x 260t/h high temperature and pressure CFB boilers+3 x 40 MW back-pressure steam turbines. Phase 1 will build 1x130 t/h + 1x260 t/h CFB boilers + 1 x 20 MW steam turbine. Department of Ecology and Environment of Guangxi Zhuang Autonomous Region passed the Environmental Impact Assessment for the project.[3]

According to the 2023 Guangxi Energy Infrastructure Construction Work Plan, the construction started in October 2021 and is expected to complete in November 2023.[4] As in April 2023, 75% of plant structural work was completed.[5] It was reported that the boiler was lighted up on 30 June 2023.[6]

Articles and Resources

References

  1. https://web.archive.org/web/20240125085055/http://www.lbnews.com.cn/content/2023-07/03/content_103169.htm. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240125085039/http://www.vipstar.com.cn/a/dianlinenyuan/2023/0803/126496.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. "广西来宾市三江口节能环保生态产业园热电联产项目环境影响报告书的批复". 北极星垃圾发电网. 2021-11-26. Retrieved 2023-7-21. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. 广西发改委 (2023-03-30). "广西能源基础设施建设2023年工作推进方案". 北极星能源网. Retrieved 2023-7-21. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  5. 雅居乐环保集团 (2022-4-26). "软硬实力"双提升",雅居乐环保集团象州产业园区建设高效推进". 环联网. Retrieved 2023-7-24. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  6. 来宾日报 (2023-07-03). "三江口节能环保生态产业园热电烘炉成功点火". 广西来宾市人民政府网站. Retrieved 2023-7-24. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)