Lambert solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Lambert solar farm is a solar photovoltaic (PV) farm in pre-construction in Georgetown County, South Carolina, United States.
Project Details
Table 1: Phase-level project details for Lambert solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Pre-construction[1] | 2025 (planned)[2] | 100 MWac[3] | PV[3] | Silicon Ranch Corp [100%][3] | Silicon Ranch[3] |
2 | Pre-construction[4] | – | 100 MW[3] | PV[3] | Silicon Ranch Corp [100%][3] | Silicon Ranch[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Lambert solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Georgetown County, South Carolina, United States[3] | 33.4453, -79.1240 (approximate)[3] |
2 | Georgetown County, South Carolina, United States[3] | 33.4453, -79.1240 (approximate)[3] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ https://wpde.com/news/local/silicon-ranch-addresses-delays-and-council-concerns-at-georgetown-solar-farm-lambert-town-fears-doubts-frustrations-workshop-progress-construction https://www.eia.gov/electricity/data/eia860m/, https://wpde.com/news/local/silicon-ranch-addresses-delays-and-council-concerns-at-georgetown-solar-farm-lambert-town-fears-doubts-frustrations-workshop-progress-construction.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 https://web.archive.org/web/20240201182421/https://pv-magazine-usa.com/2021/06/23/santee-cooper-and-central-electric-power-contract-for-425-mw-of-new-south-carolina-solar/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Silicon Ranch gets final zoning change approval for Lamberttown solar farm". gabnewsonline.com. Archived from the original on 2024-08-30. Retrieved 2024-08-20.