Lantang Khola Yeti hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Other names: Lantang Khola hydroelectric plant

Lantang Khola Yeti hydroelectric plant is a hydroelectric power plant in pre-construction in Langtang Valley, Rasuwa District, Bagmati Zone, Bagmati Province, Nepal.

Project Details

Table 1: Project details for Lantang Khola Yeti hydroelectric plant

Status Nameplate capacity Technology type Operator
Pre-construction[1] 310 MW[1] Conventional storage[1] Yeti Langtang Energy[2]

Location

Table 2: Location details for Lantang Khola Yeti hydroelectric plant

Location River Coordinates (WGS 84)
Langtang Valley, Rasuwa District, Bagmati Zone, Bagmati Province, Nepal[1] Langtang River[1] 28.1501, 85.3753 (approximate)[1]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20221020003431/http://www.doed.gov.np/license/41. Archived from the original on 2022-10-20. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20200807141204/https://www.waterpowermagazine.com/news/newschmc-signs-deal-for-langtang-khola-project-nepal-6018892. Archived from the original on 2020-08-07. {{cite web}}: Missing or empty |title= (help)