Lantueno (Boreas) wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Lantueno (Boreas) wind farm is a cancelled wind farm in Santiurde de Reinosa, Cantabria, Spain.

Project Details

Table 1: Phase-level project details for Lantueno (Boreas) wind farm

Status Nameplate capacity Type Owner
Cancelled[1] 16 MW[2] Onshore[2] Boreas Eólica SA [100%][1]

Location

Table 2: Phase-level location details for Lantueno (Boreas) wind farm

Location Coordinates (WGS 84)
Santiurde de Reinosa, Cantabria, Spain[2] 43.0610, -4.0834 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240126145121/https://www.europapress.es/cantabria/noticia-supremo-casa-sentencia-anulaba-proyectos-ejecucion-parques-eolicos-lantueno-somballe-20150416105933.html. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240126045214/http://surdecantabrianatural.blogspot.com/p/alegaciones-eolicas.html. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)