Laoag Solar Power Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Laoag 2 Solar Power Project, 98.136 MWp/81.780MW Laoag Solar Power Project

Laoag Solar Power Project is a solar photovoltaic (PV) farm under construction in Aguilar, Pangasinan Province, Philippines.

Project Details

Table 1: Phase-level project details for Laoag Solar Power Project

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Construction[1] 2023 (planned)[1] 58 MWp/dc[2] PV[2]
2 Construction[1] 2023 (planned)[1] 71 MWp/dc[3] PV[1] AboitizPower CORP[4][3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Laoag Solar Power Project

Phase Name Location Coordinates (WGS 84)
1 Aguilar, Pangasinan Province, Philippines[2] 15.8890, 120.2384 (approximate)[2]
2 Laoag, Pangasinan Province, Philippines[3] 18.1865, 120.5572 (approximate)[3]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 (PDF) https://aboitizpower.com/uploads/media/AP-SEC-FORM-17-A---2022-Annual-Report-(04132023).pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/06_Luzon%20Indicative.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2022-mar-31-updated-05172022.pdf?withshield=1. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://aboitizpower.com/uploads/media/FY4Q2021-AP-Financial-and-Operating-Results.pdf. {{cite web}}: Missing or empty |title= (help)