Lea County power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Lea County power station is an announced power station in Lovington, Lea County, New Mexico, United States.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Lea County power station Lovington, Lea County, New Mexico, United States 32.94, -103.35 (approximate)[1][2]
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Phase 1 Announced[1][2] fossil gas: natural gas[1][2] 2000[1][2] unknown 2028 (planned)[3] no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
Phase 1 New Era Energy & Digital[1][2] New Era Energy & Digital Inc [100%][1][2] New Era Energy & Digital Inc [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): power[1][2]
  • Captive industry: Data Center[1][2]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Impacts

Potential emissions and details on the project's status and permit applications can be viewed on Oil and Gas Watch page here.

The Oil and Gas Watch database, created by Environmental Integrity Project (EIP), is a free, public-facing tool designed to track the rapid expansion of fossil fuel and petrochemical infrastructure in the United States. Oil and Gas Watch maps new and expanding oil, gas, and petrochemical infrastructure projects across the country and monitors each project’s construction status so the public can stay informed about major oil and gas developments being proposed in their communities. We track key environmental approvals companies must obtain before starting construction or operations and provide access to thousands of government records and permits unearthed by our analysts.

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.businesswire.com/news/home/20251106765936/en/New-Era-Energy-Digital-Enters-into-Land-Option-Purchase-Agreement-for-3500-Acres-in-New-Mexico-for-7GW-AI-Data-Center-Hub-Marks-first-Wholly-Owned-Development-Separate-from-TCDC-Joint-Venture. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://www.datacenterdynamics.com/en/news/new-era-plans-7gw-ai-data-center-in-lea-county-new-mexico-powered-by-gas-and-nuclear/. {{cite web}}: Missing or empty |title= (help)
  3. https://www.barchart.com/story/news/35949566/new-era-energy-digital-enters-into-land-option-purchase-agreement-for-3-500-acres-in-new-mexico-for-7gw-ai-data-center-hub. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.