Libofshë solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Libofsha

Libofshë solar farm is a solar photovoltaic (PV) farm in pre-construction in Libofshë, Fier Municipality, Fier County, Southern Albania, Albania.

Project Details

Table 1: Phase-level project details for Libofshë solar farm

Status Nameplate capacity Technology Owner
Pre-construction[1] 50 MW[2] PV[2] Agna Renewables LTD[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Libofshë solar farm

Location Coordinates (WGS 84)
Libofshë, Fier Municipality, Fier County, Southern Albania, Albania[3] 40.7420, 19.5697 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://balkangreenenergynews.com/albania-has-570-mw-of-solar-projects-in-pipeline/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://balkangreenenergynews.com/two-solar-power-projects-of-150-mw-in-total-launched-in-albania/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 (PDF) https://www.infrastruktura.gov.al/wp-content/uploads/2021/06/Njoftim-online-infotelecom.pdf. {{cite web}}: Missing or empty |title= (help)