Lily Solar Hybrid
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Lily Kaufman
Lily Solar Hybrid is an operating solar photovoltaic (PV) farm in Scurry, Kaufman County, Texas, United States.
Project Details
Table 1: Phase-level project details for Lily Solar Hybrid
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1][2] | 2021[1][2] | 147 MWac[3] | PV[4] | Enel Green Power SPA[5] | Enel Green Power SPA[5] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Lily Solar Hybrid
Location | Coordinates (WGS 84) |
---|---|
Scurry, Kaufman County, Texas, United States[3] | 32.5333, -96.4290 (exact)[4] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://pv-magazine-usa.com/2021/12/21/watch-enel-activates-181-mw-solar-55-mw-storage-in-texas/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://renews.biz/74550/enel-powers-up-two-us-projects/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. 2023. Retrieved September 29, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4.0 4.1 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ 5.0 5.1 https://www.enelgreenpower.com/our-projects/under-construction/lily-solar-storage-project.
{{cite web}}
: Missing or empty|title=
(help)