Lily Solar Hybrid

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Lily Kaufman

Lily Solar Hybrid is an operating solar photovoltaic (PV) farm in Scurry, Kaufman County, Texas, United States.

Project Details

Table 1: Phase-level project details for Lily Solar Hybrid

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1][2] 2021[1][2] 147 MWac[3] PV[4] Enel Green Power SPA[5] Enel Green Power SPA[5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Lily Solar Hybrid

Location Coordinates (WGS 84)
Scurry, Kaufman County, Texas, United States[3] 32.5333, -96.4290 (exact)[4]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://pv-magazine-usa.com/2021/12/21/watch-enel-activates-181-mw-solar-55-mw-storage-in-texas/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://renews.biz/74550/enel-powers-up-two-us-projects/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. 2023. Retrieved September 29, 2023.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022. {{cite web}}: Check date values in: |archive-date= (help)
  5. 5.0 5.1 https://www.enelgreenpower.com/our-projects/under-construction/lily-solar-storage-project. {{cite web}}: Missing or empty |title= (help)