Lingtai power station (山东能源灵台煤电一体化电厂) is an operating power station of at least 2000-megawatts (MW) in Lingtai, Pingliang, Gansu, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Lingtai power station Lingtai, Pingliang, Gansu, China 35.0858218, 107.7152829 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4: 35.0858218, 107.7152829

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 Operating[2] coal: bituminous[1] 1000[1] ultra-supercritical[1] 2025[2]
Unit 2 Operating[3] coal: bituminous[1] 1000[1] ultra-supercritical[1] 2025[2]
Unit 3 Shelved coal: lignite[4] 1000[4] ultra-supercritical[4]
Unit 4 Shelved coal: lignite[4] 1000[4] ultra-supercritical[4]

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Shandong Energy Group Lingtai Thermal Power Co Ltd [100%][1] Shandong Energy Group Co Ltd [65.7%]; Shandong Guohui Investment Co Ltd [18.8%]; Shandong Caixin Asset Operation Co Ltd [9.4%]; Yanzhou Coal Mining Co Ltd
Unit 2 Shandong Energy Group Lingtai Thermal Power Co Ltd [100%][1] Shandong Energy Group Co Ltd [65.7%]; Shandong Guohui Investment Co Ltd [18.8%]; Shandong Caixin Asset Operation Co Ltd [9.4%]; Yanzhou Coal Mining Co Ltd
Unit 3 Shandong Energy Group Lingtai Thermal Power Co Ltd [100%][1] Shandong Energy Group Co Ltd [65.7%]; Shandong Guohui Investment Co Ltd [18.8%]; Shandong Caixin Asset Operation Co Ltd [9.4%]; Yanzhou Coal Mining Co Ltd
Unit 4 Shandong Energy Group Lingtai Thermal Power Co Ltd [100%][1] Shandong Energy Group Co Ltd [65.7%]; Shandong Guohui Investment Co Ltd [18.8%]; Shandong Caixin Asset Operation Co Ltd [9.4%]; Yanzhou Coal Mining Co Ltd

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

In October 2014, PowerChina proposed a 2,000 MW power station in Lingtai County.[5]

There was no further news until January 2020, when Gansu province and the city of Pingliang signed an agreement with Shandong Energy Group on developing a 4 x 1,000 MW coal plant. The coal would be supplied by Shandong Energy subsidiary Shenglu Coal and Chemical, which has two coal mine projects under construction.[6]

Two units were reportedly permitted on December 1, 2021, and construction reportedly began in August 2022.[7][8] Both units started operation in the second half of 2025[9][10].

In 2023, Unit 3 and Unit 4 were presumed to be shelved.

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://news.bjx.com.cn/html/20220811/1247642.shtml. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://news.bjx.com.cn/html/20250728/1453007.shtml. {{cite web}}: Missing or empty |title= (help)
  3. https://news.bjx.com.cn/html/20250904/1459230.shtml. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://news.bjx.com.cn/html/20200115/1036410.shtml. {{cite web}}: Missing or empty |title= (help)
  5. "甘肃灵台电厂初可研报告通过审查"中国火力发电网, 2014-10-11
  6. "山东能源集团与中煤大屯煤电将合作开发平凉市灵台4×1000MW煤电项目," 山东能源集团, 2020/1/15
  7. 山东能源灵台2x1000兆瓦调峰煤电项目正式开工, BJX, 2022-08-11
  8. 山东能源灵台2×1000兆瓦调峰煤电项目初步设计审查会召开, BJX News, 2022-04-24
  9. "灵台电厂首台百万机投产 "陇电入鲁"再添新支撑!". 北极星火力发电网. 2025-07-28. Retrieved 2025-09-12.{{cite web}}: CS1 maint: url-status (link)
  10. "山东能源灵台2×100万千瓦调峰煤电项目全面竣工投产". 北极星火力发电网. 2025-09-04. Retrieved 2025-09-12.{{cite web}}: CS1 maint: url-status (link)