30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Lirios solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Lirios solar farm (Planta fotovoltaica Lirios Solar PV) is a solar photovoltaic (PV) farm under construction in Chucena, Huelva, Andalucía, Spain.

Project Details

Table 1: Phase-level project details for Lirios solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Construction[1] 2025 (planned)[2] 87.1 MWac[3] PV[3] Encavis AG [100%][2] Solar Castuera[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Lirios solar farm

Location Coordinates (WGS 84)
Chucena, Huelva, Andalucía, Spain[3] 37.3671, -6.3876 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. "Encavis adquiere en España los proyectos solares Lirios, de 109 MW, y La Florida, de 30 MW". pv magazine España. 2024-02-26. Archived from the original on 2024-04-15. Retrieved 2024-03-29.
  2. 2.0 2.1 https://www.pveurope.eu/solar-parks/financing-spain-baywa-re-sells-109-mw-solar-park-encavis https://www.pv-magazine.es/2024/02/26/encavis-adquiere-en-espana-los-proyectos-solares-lirios-de-109-mw-y-la-florida-de-30-mw/, https://www.pveurope.eu/solar-parks/financing-spain-baywa-re-sells-109-mw-solar-park-encavis. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 "BOE-A-2023-11011 Resolución de 21 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Solar Castuera, SL, la autorización administrativa previa y la autorización administrativa de construcción para la instalación fotovoltaica Lirios Solar PV de 87,12 MW de potencia instalada". Boletín Oficial del Estado. 2023-05-08. Archived from the original on 2024-04-15. Retrieved 2024-03-29.