Zheneng Liuheng power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Zheneng Liuheng power station (浙能中煤舟山煤电公司六横发电厂) is an operating power station of at least 4000-megawatts (MW) in Liuheng, Putuo, Zhoushan, Zhejiang, China. It is also known as 浙能六横电厂二期项目 (Unit 3 & 4).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Zheneng Liuheng power station | Liuheng, Putuo, Zhoushan, Zhejiang, China | 29.7593387, 122.1266091 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 29.7593387, 122.1266091
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Operating | coal: bituminous[1] | 1000 | ultra-supercritical | 2014 | False |
| Unit 2 | Operating | coal: bituminous[1] | 1000 | ultra-supercritical | 2014 | False |
| Unit 3 | Operating[2] | coal: bituminous[3][1] | 1000[3] | ultra-supercritical[3] | 2024[2] | False |
| Unit 4 | Operating[4] | coal: bituminous[3][1] | 1000[3] | ultra-supercritical[3] | 2024[4] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Zhejiang Zheneng Zhongmei Zhoushan Coal Power Co Ltd [100%][3] | Zhejiang Zheneng Electric Power Co Ltd [63.0%]; China Coal Energy Co Ltd [27.0%]; Success Medals International [4.9%]; Jaslene Ltd [2.8%]; Hong Kong Wanye Group Co Ltd [2.3%] |
| Unit 2 | Zhejiang Zheneng Zhongmei Zhoushan Coal Power Co Ltd [100%][3] | Zhejiang Zheneng Electric Power Co Ltd [63.0%]; China Coal Energy Co Ltd [27.0%]; Success Medals International [4.9%]; Jaslene Ltd [2.8%]; Hong Kong Wanye Group Co Ltd [2.3%] |
| Unit 3 | Zhejiang Zheneng Zhongmei Zhoushan Coal Power Co Ltd [100%][3] | Zhejiang Zheneng Electric Power Co Ltd [63.0%]; China Coal Energy Co Ltd [27.0%]; Success Medals International [4.9%]; Jaslene Ltd [2.8%]; Hong Kong Wanye Group Co Ltd [2.3%] |
| Unit 4 | Zhejiang Zheneng Zhongmei Zhoushan Coal Power Co Ltd [100%][3] | Zhejiang Zheneng Electric Power Co Ltd [63.0%]; China Coal Energy Co Ltd [27.0%]; Success Medals International [4.9%]; Jaslene Ltd [2.8%]; Hong Kong Wanye Group Co Ltd [2.3%] |
Project-level coal details
- Coal source(s): domestic/imported
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
Zheneng Liuheng power station is a two-unit coal-fired power plant with a total capacity of 2,000 MW in Zhejiang Province. The plant began operating in 2014.[5] [6][7]
Expansion
The capacity proposed at Datang Wushashan power station was transferred to the the Zheneng Liuheng power station.[8]
In late 2021, the local government anticipated getting a permit by the end of the year and beginning construction soon after. It was planning to install controversial CCUS technology to curb emissions.[9][10]
The additional capacity was permitted in February 2022. The first unit was planned to be completed and put into operation by the end of December 2024.[11]
Unit 3 had the steel roof truss of the turbine hall hoisted in September 2023[12]. In 2024, the generator stator was hoisted in January[13], the generator rotor was inserted in March[14], and the unit was connected to the grid in June[15]. In July 2024, the unit passed the 168-hour trial[16].
Unit 4 had the boiler beam hoisted in August 2023[17]. In 2024, the generator stator was hoisted in July[18], boiler ignition succeeded in September[19], and the unit was connected to the grid in October[20]. In November 2024, the unit passed the 168-hour trial[21].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 "浙能六横电厂二期2×1000MW项目3号机组正式投运-北极星火力发电网". news.bjx.com.cn. 2024-07-12. Archived from the original on 2024-07-30. Retrieved 2024-07-22.
- ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 "浙能六横电厂二期项目获省发改委核准批复". http://lhgwh.zhoushan.gov.cn. 2022-02-10. Archived from the original on 2024-01-25.
{{cite web}}: External link in(help)|website= - ↑ 4.0 4.1 https://news.bjx.com.cn/html/20241119/1411533.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "各大媒体竞相报道六横电厂1号机组正式商业投产", 浙江省能源集团有限公司, 2014-07-11
- ↑ "浙能六横电厂1号燃煤发电机组投运 实现超低排放", 浙江在线, 2014-07-10
- ↑ "国内首家新建超低排放电厂——浙能六横电厂2号机组圆满通过168小时," CECX, 2014-09-18
- ↑ "浙江省拟新建2台百万机组 大唐&浙能合作建设," 北极星电力网新闻中心, 2021/8/10
- ↑ "2×1000MW!浙能六横电厂二期工程取得赋码," 北极星电力网新闻中心, 2021/10/20
- ↑ "六横加快推进煤电二期建设助力电力绿色保供," 地区管理员, 2021-11-05
- ↑ 中国浙江省批准浙能六横电厂二期和国能舟山三期煤电项目,总投资129亿元, Feb. 9, 2022
- ↑ "六横电厂二期3号汽机房首根钢屋架吊装就位". 微信公众平台. 2023-11-22. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "六横电厂二期3号机组发电机定子吊装就位". 微信公众平台. 2024-03-21. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "六横电厂二期3号机组发电机转子穿装成功". 北极星电力网. 2024-03-21. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "六横电厂二期3号机组并网发电成功". 北极星电力网. 2024-06-19. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "六横电厂二期3号机组通过168小时试运行". 北极星电力网. 2024-07-12. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "六横电厂二期4号炉大板梁成功首吊". 微信公众平台. 2023-11-22. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "六横电厂二期4号机组发电机定子吊装就位". 北极星电力网. 2024-07-09. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "六横电厂二期4号机组锅炉点火一次成功". 北极星电力网. 2024-09-20. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "六横电厂二期4号机组并网发电成功". 北极星电力网. 2024-10-23. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "六横电厂二期4号机组通过168小时试运行". 北极星电力网. 2024-11-19. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.