Lixin Banji power station (中煤新集电力安徽利辛板集电厂) is an operating power station of at least 3320-megawatts (MW) in Banji, Lixin, Bozhou, Anhui, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Lixin Banji power station Banji, Lixin, Bozhou, Anhui, China 32.897245, 116.242561 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 32.897245, 116.242561

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 Operating coal: unknown 1000 ultra-supercritical 2016
Phase I Unit 2 Operating coal: unknown 1000 ultra-supercritical 2016
Phase II Unit 3 Operating[1] coal: unknown 660 ultra-supercritical 2024 (planned)
Phase II Unit 4 Operating[2] coal: unknown 660 ultra-supercritical 2024 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 China Coal Xinji Lixin Power Generation Co Ltd [100%] China Coal Xinji Energy Co Ltd [55.0%]; An Hui Wenergy Co Ltd [45.0%]
Phase I Unit 2 China Coal Xinji Lixin Power Generation Co Ltd [100%] China Coal Xinji Energy Co Ltd [55.0%]; An Hui Wenergy Co Ltd [45.0%]
Phase II Unit 3 China Coal Xinji Lixin Power Generation Co Ltd [100%] China Coal Xinji Energy Co Ltd [55.0%]; An Hui Wenergy Co Ltd [45.0%]
Phase II Unit 4 China Coal Xinji Lixin Power Generation Co Ltd [100%] China Coal Xinji Energy Co Ltd [55.0%]; An Hui Wenergy Co Ltd [45.0%]

Background on Project

SDIC is sponsor of a two-unit coal-fired power plant of 2,000 MW in Anhui Province. In November 2013, SDIC signed a construction contract with Shandong Electric Power Engineering Consulting Institute Corp., with construction slated to begin in 2014 and be completed in 2016.[3]

Environmental permits were issued in March 2014.[4]

The power station went online in 2016.[5][6]

Expansion

In March 2020, two additional 1,000 MW units at the power station (Units 3-4) were listed as a priority project for Anhui province, as part of a UHV power hub in the Yangtze River Delta.[7]

In January 2021, two new 660 MW units at the power station were permitted for construction.[8][9]

As of May 2021, construction was expected to begin by early 2022.[10] It began in September 2022.[11]

Ownership

The parent company changed from SDIC to China Coal and Wenergy Group in December 2016.[12]

Articles and Resources

References

  1. https://news.bjx.com.cn/html/20240902/1398089.shtml. {{cite web}}: Missing or empty |title= (help)
  2. https://news.bjx.com.cn/html/20241009/1404048.shtml. {{cite web}}: Missing or empty |title= (help)
  3. SDEPCI signed EPC contract for SDIC Banji 2×1000MW units project, SDEPCI press release, accessed Nov. 2014.
  4. "关于安徽利辛板集电厂(2×1000MW)新建工程环境影响报告书的批复,", 中华人民共和国环境保护部 , 2014-03-13.
  5. "国投新集电力利辛板集电厂#1机一次顺利通过168小时试运行," SDIC, 2016-08-24
  6. "安徽省环保厅关于拟作出安徽利辛板集电厂(2×1000MW)新建工程脱硫、脱硝、除尘设施竣工环境保护验收意见的公开," Anhui DEP, 2017-1-4
  7. "全文|安徽省实施长江三角洲区域一体化发展规划纲要行动计划," 安徽省人民政府, 2020/3/13
  8. "2×660MW!中煤新集利辛板集电厂二期项目核准前公示 - 北极星火力发电网". news.bjx.com.cn. 2021-01-14. Retrieved 2021-01-05.{{cite web}}: CS1 maint: url-status (link)
  9. 2×660MW!中煤新集利辛板集电厂二期项目获得核准批复, BJX, 2021-02-01
  10. "新集能源:中煤新集利辛板集电厂二期项目计划2021年底或2022年初开工建设," ifeng, May 17, 2021
  11. 2×660MW!安徽板集电厂二期项目开工, BJX, 2022-09-30
  12. "新集能源:央企改革初见成效,未来将积极推动煤电一体化," China Finance, 2017-06-22

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.