Lixin Banji power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Lixin Banji power station (中煤新集电力安徽利辛板集电厂) is an operating power station of at least 2000-megawatts (MW) in Banji, Lixin, Bozhou, Anhui, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Lixin Banji power station Banji, Lixin, Bozhou, Anhui, China 32.897245, 116.242561 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 32.897245, 116.242561

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - unknown 1000 ultra-supercritical 2016
Phase I Unit 2 operating coal - unknown 1000 ultra-supercritical 2016
Phase II Unit 3 construction coal - unknown 660 ultra-supercritical
Phase II Unit 4 construction coal - unknown 660 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 China Coal Xinji Lixin Power Generation Co Ltd [100.0%]
Phase I Unit 2 China Coal Xinji Lixin Power Generation Co Ltd [100.0%]
Phase II Unit 3 China Coal Xinji Lixin Power Generation Co Ltd [100.0%]
Phase II Unit 4 China Coal Xinji Lixin Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): January 30, 2021, December 2014

Background on Project

SDIC is sponsor of a two-unit coal-fired power plant of 2,000 MW in Anhui Province. In November 2013, SDIC signed a construction contract with Shandong Electric Power Engineering Consulting Institute Corp., with construction slated to begin in 2014 and be completed in 2016.[1]

Environmental permits were issued in March 2014.[2]

The power station went online in 2016.[3][4]

Expansion

In March 2020, two additional 1,000 MW units at the power station (Units 3-4) were listed as a priority project for Anhui province, as part of a UHV power hub in the Yangtze River Delta.[5]

In January 2021, two new 660 MW units at the power station were permitted for construction.[6][7]

As of May 2021, construction was expected to begin by early 2022.[8] It began in September 2022.[9]

Ownership

The parent company changed from SDIC to China Coal and Wenergy Group in December 2016.[10]

Articles and Resources

References

  1. SDEPCI signed EPC contract for SDIC Banji 2×1000MW units project, SDEPCI press release, accessed Nov. 2014.
  2. "关于安徽利辛板集电厂(2×1000MW)新建工程环境影响报告书的批复,", 中华人民共和国环境保护部 , 2014-03-13.
  3. "国投新集电力利辛板集电厂#1机一次顺利通过168小时试运行," SDIC, 2016-08-24
  4. "安徽省环保厅关于拟作出安徽利辛板集电厂(2×1000MW)新建工程脱硫、脱硝、除尘设施竣工环境保护验收意见的公开," Anhui DEP, 2017-1-4
  5. "全文|安徽省实施长江三角洲区域一体化发展规划纲要行动计划," 安徽省人民政府, 2020/3/13
  6. "2×660MW!中煤新集利辛板集电厂二期项目核准前公示 - 北极星火力发电网". news.bjx.com.cn. 2021-01-14. Retrieved 2021-01-05.{{cite web}}: CS1 maint: url-status (link)
  7. 2×660MW!中煤新集利辛板集电厂二期项目获得核准批复, BJX, 2021-02-01
  8. "新集能源:中煤新集利辛板集电厂二期项目计划2021年底或2022年初开工建设," ifeng, May 17, 2021
  9. 2×660MW!安徽板集电厂二期项目开工, BJX, 2022-09-30
  10. "新集能源:央企改革初见成效,未来将积极推动煤电一体化," China Finance, 2017-06-22

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.