Lixin Banji power station

From Global Energy Monitor

Lixin Banji power station (中煤新集电力安徽利辛板集电厂) is a 2,000-megawatt (MW) coal-fired power plant in Anhui Province, China.

An additional 2 x 660 MW is proposed.

Location

The map below shows the plant, near Banji Village (Banjicun), Lixin County, Bozhou Prefecture, Anhui Province.

Loading map...

Background on Project

SDIC is sponsor of a two-unit coal-fired power plant of 2,000 MW in Anhui Province. In November 2013, SDIC signed a construction contract with Shandong Electric Power Engineering Consulting Institute Corp., with construction slated to begin in 2014 and be completed in 2016.[1]

Environmental permits were issued in March 2014.[2]

The power station went online in 2016.[3][4]

Expansion

In March 2020, two additional 1,000 MW units at the power station (Units 3-4) were listed as a priority project for Anhui province, as part of a UHV power hub in the Yangtze River Delta.[5]

In January 2021, two new 660 MW units at the power station were permitted for construction.[6][7]

As of May 2021, construction was expected to begin by early 2022.[8] It began in September 2022.[9]

Ownership

The parent company changed from SDIC to China Coal and Wenergy Group in December 2016.[10]

Project Details

  • Sponsor: China Coal Xinji Lixin Power Generation Co., Ltd. 中煤新集利辛发电有限公司 [11]
  • Owner: China Coal Xinji Energy Co.,Ltd. 55%; ANHUI WENERGY COMPANY LIMITED 45%.
  • Parent: China National Coal Group Corporation (China Coal)
  • Location: Banji Village (Banjicun), Lixin County, Bozhou Prefecture, Anhui Province, China
  • Coordinates: 32.897245, 116.242561 (exact)
  • Status: Operating (Units 1&2), Construction (Units 3&4)
  • Gross capacity: 2,000 MW (Units 1 & 2: 1,000 MW), 1,320 MW (Units 3 & 4: 660 MW)
  • Type: Ultra-Supercritical
  • Start year: 2016 (Units 1&2)
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and resources

References

  1. SDEPCI signed EPC contract for SDIC Banji 2×1000MW units project, SDEPCI press release, accessed Nov. 2014.
  2. "关于安徽利辛板集电厂(2×1000MW)新建工程环境影响报告书的批复,", 中华人民共和国环境保护部 , 2014-03-13.
  3. "国投新集电力利辛板集电厂#1机一次顺利通过168小时试运行," SDIC, 2016-08-24
  4. "安徽省环保厅关于拟作出安徽利辛板集电厂(2×1000MW)新建工程脱硫、脱硝、除尘设施竣工环境保护验收意见的公开," Anhui DEP, 2017-1-4
  5. "全文|安徽省实施长江三角洲区域一体化发展规划纲要行动计划," 安徽省人民政府, 2020/3/13
  6. "2×660MW!中煤新集利辛板集电厂二期项目核准前公示 - 北极星火力发电网". news.bjx.com.cn. 2021-01-14. Retrieved 2021-01-05.{{cite web}}: CS1 maint: url-status (link)
  7. 2×660MW!中煤新集利辛板集电厂二期项目获得核准批复, BJX, 2021-02-01
  8. "新集能源:中煤新集利辛板集电厂二期项目计划2021年底或2022年初开工建设," ifeng, May 17, 2021
  9. 2×660MW!安徽板集电厂二期项目开工, BJX, 2022-09-30
  10. "新集能源:央企改革初见成效,未来将积极推动煤电一体化," China Finance, 2017-06-22
  11. "中煤新集利辛发电有限公司 - 企查查". www.qcc.com. Retrieved 2021-04-20.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources