Lombok 2 power station is a power station in East Lombok, Nusa Tenggara, Indonesia with multiple units of varying statuses, none of which are currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Lombok 2 power station | East Lombok, Nusa Tenggara, Indonesia | -8.348033, 116.717168 (approximate) |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| New 1 | Pre-construction[1] | fossil gas: natural gas[1] | 50[1] | ICCC[1] | 2026 (planned)[1] | no |
| New 2 | Pre-construction[1] | fossil gas: natural gas[1] | 50[1] | ICCC[1] | 2026 (planned)[1] | no |
| Unit 1 | Cancelled | coal: unknown | 50 | subcritical | 2023 | no |
| Unit 2 | Cancelled | coal: unknown | 50 | subcritical | 2024 | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| New 1 | PT PLN (Persero) [100%][1] | PT PLN (Persero) [100.0%] |
| New 2 | PT PLN (Persero) [100%][1] | PT PLN (Persero) [100.0%] |
| Unit 1 | PT PLN (Persero) [100%][1] | PT PLN (Persero) [100.0%] |
| Unit 2 | PT PLN (Persero) [100%][1] | PT PLN (Persero) [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The project was included in the 2015-2024 supply plan for PT PLN.[2] In the 2017-2026 long-range plan, the units are both scheduled for 2020.[3] The project does not appear in the 2018-2027 long-range plan. The two units are scheduled for 2023 and 2024 in the long-range plan for 2019-2028[4] The two units are replaced with gas units in the 2021-2030 long-range plan.[5]
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 (PDF) https://web.archive.org/web/20260311161557/https://gatrik.esdm.go.id/assets/uploads/download_index/files/b967d-ruptl-pln-2025-2034-pub-.pdf. Archived from the original (PDF) on 2026-03-11.
{{cite web}}: Missing or empty|title=(help) - ↑ "Executive Summary: Electricity Supply Business Plan PT PLN (Persero) 2015-2024"
- ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2017-2026, PT PLN Persero, p. VI-65
- ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2019-2028, PT PLN Persero, p. V-91
- ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2021-2030, PT PLN Persero. V-13