Lombok 4 power station

From Global Energy Monitor

Lombok 4 power station is a power station in North Lombok, Nusa Tenggara, Indonesia with multiple units of varying statuses, none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Lombok 4 power station North Lombok, Nusa Tenggara, Indonesia -8.573277, 116.351124 (approximate)
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
New 1 Announced[1] fossil gas: natural gas[1] 50 ICCC[1] 2030 (planned)[1] no
New 2 Announced[1] fossil gas: natural gas[1] 50 ICCC[1] 2030 (planned)[1] no
Unit 1 Cancelled coal: unknown 50 subcritical 2028 no
Unit 2 Cancelled coal: unknown 50 subcritical 2029 no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
New 1 PT PLN (Persero) [100%][1] PT PLN (Persero) [100.0%]
New 2 PT PLN (Persero) [100%][1] PT PLN (Persero) [100.0%]
Unit 1 PT PLN (Persero) [100%][1] PT PLN (Persero) [100.0%]
Unit 2 PT PLN (Persero) [100%][1] PT PLN (Persero) [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The two units are scheduled for 2027 and 2028 in the 2019-2028 long-range plan.[2]

In June 2021, the Indonesian government announced that it would no longer allow construction of coal-fired power stations after 2025 and updated its plans for many coal-fired projects under development. The Lombok-4 power station is now planned to be powered by a mixture of energy sources, including gas and renewable energy, and excluding coal, with a target operation date of 2028/2029.[3]

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 (PDF) https://web.archive.org/web/20260311161557/https://gatrik.esdm.go.id/assets/uploads/download_index/files/b967d-ruptl-pln-2025-2034-pub-.pdf. Archived from the original (PDF) on 2026-03-11. {{cite web}}: Missing or empty |title= (help)
  2. ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2019-2028, PT PLN Persero, p. V-91
  3. ↑ https://newssetup.kontan.co.id/news/proyek-pltu-bakal-disetop-mulai-2025-energi-terbarukan-digenjot?page=all Proyek PLTU bakal disetop mulai 2025, energi terbarukan digenjot], Kontan, June 12, 2021

Additional data

To access additional data, including interactive maps of the power stations, downloadable datasets, and summary data, please visit the Global Coal Plant Tracker and the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.