Lomillas Hybrid solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Lomillas Hybrid solar farm (Instalación fotovoltaica híbrida Las Lomillas) is a solar photovoltaic (PV) farm under construction in Tébar, Cuenca, Castilla-La Mancha, Spain.

Project Details

Table 1: Phase-level project details for Lomillas Hybrid solar farm

Status Nameplate capacity Technology Owner Operator
Construction[1] 39 MWac[1] PV[2] EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [100%] (EDPR Ανανεωσιμες Πηγες Ενεργειας Ελλας 1 Μονοπροσωπη Ανωνυμη Εταιρεια)[2] Tébar Eólica[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Lomillas Hybrid solar farm

Location Coordinates (WGS 84)
Tébar, Cuenca, Castilla-La Mancha, Spain[3] 39.4691, -2.1709 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Related Projects

This project is related to the following project:


Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://www.edp.com/sites/default/files/2023-05/edpON_revista_global_2_es.pdf https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2821, https://www.edp.com/sites/default/files/2023-05/edpON_revista_global_2_es.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 "Luz verde a casi 10 GW en los BOE de febrero con baterías, hibridación y megaplantas en Galicia". pv magazine España. 2023-02-10. Archived from the original on 2024-01-26.
  3. 3.0 3.1 3.2 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2821 https://www.pv-magazine.es/2023/02/10/luz-verde-a-casi-10-gw-en-los-boe-de-febrero-con-baterias-hibridacion-y-megaplantas-en-galicia/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2821. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)