Long Range wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Project Nujio’qonik (Phase 3)

Long Range wind farm is a wind farm in pre-construction in Newfoundland and Labrador, Canada.

Project Details

Table 1: Phase-level project details for Long Range wind farm

Phase name Status Nameplate capacity Type Owner
1 Pre-construction[1] 1000 MW[2] Onshore[2] World Energy GH2[2]

Location

Table 2: Phase-level location details for Long Range wind farm

Phase Name Location Coordinates (WGS 84)
1 Newfoundland and Labrador, Canada[2] 48.1494, -58.5133 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://ammoniaenergy.org/articles/harnessing-wind-power-for-ammonia-on-canadas-atlantic-coast/ https://worldenergygh2.com/about/, https://ammoniaenergy.org/articles/harnessing-wind-power-for-ammonia-on-canadas-atlantic-coast/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 "About Us". Archived from the original on 2024-05-03. Retrieved 2024-06-14.