Longchuan power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Longchuan power station (阳煤南煤龙川发电厂) is an operating power station of at least 270-megawatts (MW) in Shimenkou Town Longchuan, Pingding, Yangquan, Shanxi, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Longchuan power station | Shimenkou Town Longchuan, Pingding, Yangquan, Shanxi, China | 37.794692, 113.704119 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 37.794692, 113.704119
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | Operating | coal: waste coal | 135 | unknown | 2008 |
Unit 2 | Operating | coal: waste coal | 135 | unknown | 2008 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Yangquan Nanmei Longchuan Power Generation Co Ltd [100%] | Shanxi State-Owned Capital Investment and Operation Co Ltd [52.0%]; Yangquan Nanzhuang Coal Group Co Ltd [24.3%]; China Cinda Asset Management Co Ltd [17.7%]; Yangquan Coal Industry (Group) Co Ltd [3.0%]; Shanxi Enorgy & Transport Investment Co Ltd [2.4%]; Shanxi Coking Coal Group Co Ltd [0.3%]; unknown [0.2%] |
Unit 2 | Yangquan Nanmei Longchuan Power Generation Co Ltd [100%] | Shanxi State-Owned Capital Investment and Operation Co Ltd [52.0%]; Yangquan Nanzhuang Coal Group Co Ltd [24.3%]; China Cinda Asset Management Co Ltd [17.7%]; Yangquan Coal Industry (Group) Co Ltd [3.0%]; Shanxi Enorgy & Transport Investment Co Ltd [2.4%]; Shanxi Coking Coal Group Co Ltd [0.3%]; unknown [0.2%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Longchuan power station (also known as the Yangquan Nanmei Longchuan power plant) began construction in April 2007 and was completed in 2008, with Unit 1 (135 MW) connected to the grid in August 2008, and Unit 2 (135 MW) connected in November 2008.[1] With a total investment is 1.48 billion RMB from the Nanmei Group and Yangquan Coal Group, the estimated annual output value of the facility is around 400 million RMB.[1] It is scheduled to be shut down in April 2037.[2]
Pollution Fine
In December, 2016, the Shanxi province's “Iron Fist Pollution Control Action” team conducted on-site inspections of 11 enterprises and construction sites in the suburbs of Yangquan City, Yuxian County, and Pingding County. Yangquan City punished 9 large enterprises - including the Longchuan Power station - with a total fine of 5.399 million RMB for not adhering to local emissions standards.[3]
Emissions Control
In 2017, the operators invested nearly 100 million RMB in emissions technology to meet environmental standards; they implemented retrofits for desulfurization, denitrification and dust removal technologies on both units.[4]
Articles and Resources
References
- ↑ 1.0 1.1 "阳泉市南煤龙川发电有限公司怎么样? - 职友集". Jobui. Retrieved 2021-06-04.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "【阳泉市南煤龙川发电有限责任公司】-看准网". Kanzhun. 2008. Retrieved 2021-06-04.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Shanxi Daily (January 4, 2017). "阳泉重处9家污染企业 共处罚金539.9万元-新华网山西". Xinhua News. Retrieved 2021-06-04.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Yangquan Daily (May 5, 2019). "龙川发电厂投资亿元开展环保改造-国际电力网". Power. Retrieved 2021-06-04.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.