Longchuan power station (阳煤南煤龙川发电厂) is an operating power station of at least 270-megawatts (MW) in Shimenkou Town Longchuan, Pingding, Yangquan, Shanxi, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Longchuan power station | Shimenkou Town Longchuan, Pingding, Yangquan, Shanxi, China | 37.794692, 113.704119 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 37.794692, 113.704119
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Unit 1 | operating | coal - waste coal | 135 | unknown | 2008 | – |
Unit 2 | operating | coal - waste coal | 135 | unknown | 2008 | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Unit 1 | Yangquan Nanmei Longchuan Power Generation Co Ltd [100.0%] |
Unit 2 | Yangquan Nanmei Longchuan Power Generation Co Ltd [100.0%] |
Background
The Longchuan power station (also known as the Yangquan Nanmei Longchuan power plant) began construction in April 2007 and was completed in 2008, with Unit 1 (135 MW) connected to the grid in August 2008, and Unit 2 (135 MW) connected in November 2008.[1] With a total investment is 1.48 billion RMB from the Nanmei Group and Yangquan Coal Group, the estimated annual output value of the facility is around 400 million RMB.[1] It is scheduled to be shut down in April 2037.[2]
Pollution Fine
In December, 2016, the Shanxi province's “Iron Fist Pollution Control Action” team conducted on-site inspections of 11 enterprises and construction sites in the suburbs of Yangquan City, Yuxian County, and Pingding County. Yangquan City punished 9 large enterprises - including the Longchuan Power station - with a total fine of 5.399 million RMB for not adhering to local emissions standards.[3]
Emissions Control
In 2017, the operators invested nearly 100 million RMB in emissions technology to meet environmental standards; they implemented retrofits for desulfurization, denitrification and dust removal technologies on both units.[4]
Articles and Resources
References
- ↑ 1.0 1.1 "阳泉市南煤龙川发电有限公司怎么样? - 职友集". Jobui. Retrieved 2021-06-04.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "【阳泉市南煤龙川发电有限责任公司】-看准网". Kanzhun. 2008. Retrieved 2021-06-04.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Shanxi Daily (January 4, 2017). "阳泉重处9家污染企业 共处罚金539.9万元-新华网山西". Xinhua News. Retrieved 2021-06-04.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Yangquan Daily (May 5, 2019). "龙川发电厂投资亿元开展环保改造-国际电力网". Power. Retrieved 2021-06-04.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.