Longwan coal mine

From Global Energy Monitor

Longwan coal mine (山西晋煤沁秀龙湾能源有限公司龙湾煤矿), the construction site is located in Yangcheng County, Jincheng City, Shanxi Province, and the designed production capacity is 4 million tonnes per year.[1]

Location

The undated satellite photo below shows the coal mine located in Qinchi Town, Yangcheng County, Jincheng City, Shanxi Province, China.

Loading map...

Coal Mine Background

On March 18, 2019, the National Development and Reform Commission approved the construction of the Longwan Coal Mine Project in Shanxi Jincheng Mining Area, with an approved production capacity of 1.2 million tons/year. This project was an illegal coal mine that started construction without approval[1]

Project Details

  • Sponsor: Shanxi Jinmei Qinxiulong Bay Energy Co., Ltd.[1]
  • Parent Company: Shanxi Jincheng Anthracite Coal Industry Group Co., Ltd. (44.71%), Yangquan Coal Industry (Group) Co., Ltd. (18.59%), Yangcheng County Yangtai Group Industry Co., Ltd. (21%), Shanxi Yujin Trading Co., Ltd. (9.9998%) ), Shanxi Juhuang Century Investment Co., Ltd. (6%)[2]
  • Location: Qinchi Town, Yangcheng County, Jincheng City, Shanxi Province, China.[3]
  • GPS Coordinates:
  • Status: Proposed [1]
  • Production Capacity: 4 Mt/year[1]
  • Workforce Size: <50[2]
  • Coal Field: Qinshui Coal Field[3]
  • Total Resource:
  • Mineable Reserves: 394.67Mt[3]
  • Coal Type: Anthracite[3]
  • Mine Size: 103.58k㎡[3]
  • Mine Type: Underground[1]
  • Start Year:
  • Source of Financing:

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "国家能源局关于山西晋城矿区龙湾煤矿项目核准的批复", 中国煤炭市场网, 检索日期:2020/08/25
  2. 2.0 2.1 "山西晋煤沁秀龙湾能源有限公司",企查查,检索日期:2020/08/25
  3. 3.0 3.1 3.2 3.3 3.4 "龙湾矿井及选煤厂环境影响报告书",中华人民共和国生态环境部,检索日期:2020/08/25

Related SourceWatch articles