Lubiatowo-Kopalino nuclear power plant

From Global Energy Monitor
Part of the
Global Nuclear Power Tracker,
a Global Energy Monitor project.
Report an error

Lubiatowo-Kopalino nuclear power plant is a nuclear power plant in pre-construction in Lubiatowo, Gmina Choczewo, Wejherowo County, Pomorskie, Poland.

Project Details

Table 1: Unit-level project details for Lubiatowo-Kopalino nuclear power plant

Unit name Status Commissioning year Nameplate capacity Reactor type Model Owner
1 Pre-construction[1][2] 2036 (planned)[3] 1250 MW[4] Pressurized water reactor[5] AP-1000[6] Polish Nuclear Power Plants [100%] (Polskie Elektrownie Jądrowe)[7]
2 Pre-construction[1][2] 2037 (planned)[8] 1250 MW[4] Pressurized water reactor[5] AP-1000[6] Polish Nuclear Power Plants [100%] (Polskie Elektrownie Jądrowe)[7]
3 Pre-construction[1][2] 2038 (planned)[8] 1250 MW[4] Pressurized water reactor[5] AP-1000[6] Polish Nuclear Power Plants [100%] (Polskie Elektrownie Jądrowe)[7]

Table 2: Additional unit-level timeline details for Lubiatowo-Kopalino nuclear power plant

Unit name Construction start Commercial operation
1 2028[8] 2036[3]
2 – 2037[8]
3 – 2038[8]

Location

Table 3: Unit-level location details for Lubiatowo-Kopalino nuclear power plant

Unit name Location Coordinates (WGS 84)
1 Lubiatowo, Gmina Choczewo, Wejherowo County, Pomorskie, Poland[9] 54.8036, 17.7881 (approximate)
2 Lubiatowo, Gmina Choczewo, Wejherowo County, Pomorskie, Poland[9] 54.8036, 17.7881 (approximate)
3 Lubiatowo, Gmina Choczewo, Wejherowo County, Pomorskie, Poland[9] 54.8036, 17.7881 (approximate)

The map below shows the approximate location of the nuclear power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Nuclear Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 "Major Engineering Services Contract Launches Poland's First Nuclear Power Project". POWER Magazine. 2023-09-27. Archived from the original on 2024-05-10. Retrieved 2024-05-09.
  2. ↑ 2.0 2.1 2.2 "Nuclear Power in Poland - World Nuclear Association". world-nuclear.org. Archived from the original on 2024-05-10. Retrieved 2024-05-09.
  3. ↑ 3.0 3.1 https://www.nucnet.org/news/new-schedule-sees-three-year-delay-for-first-nuclear-power-plant-12-4-2024. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 https://web.archive.org/web/20230129190244/https://www.intellinews.com/emerging-europe-backs-nuclear-power-to-solve-energy-needs-266106/. Archived from the original on 2023-01-29. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 https://web.archive.org/web/20220811095606/https://en.wikipedia.org/wiki/AP1000. Archived from the original on 2022-08-11. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 6.2 https://web.archive.org/web/20230324195446/https://www.powermag.com/poland-picks-westinghouse-to-build-countrys-first-nuclear-reactors/. Archived from the original on 2023-03-24. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 7.2 https://web.archive.org/web/20220907193143/https://world-nuclear.org/information-library/country-profiles/countries-o-s/poland.aspx. Archived from the original on 2022-09-07. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 8.2 8.3 8.4 https://www.ans.org/news/2026-04-02/article-7903/construction-license-application-submitted-for-polands-first-nuclear-plant/. {{cite web}}: Missing or empty |title= (help)
  9. ↑ 9.0 9.1 9.2 https://web.archive.org/web/20220802202337/https://www.world-nuclear-news.org/Articles/EIA-submitted-for-Polands-first-nuclear-power-plan. Archived from the original on 2022-08-02. {{cite web}}: Missing or empty |title= (help)