Lucera-San Paolo Gas Pipeline

From Global Energy Monitor

{Navbar-Global Gas Infrastructure Tracker} The Lucera-San Paolo Gas Pipeline is gas pipeline under construction in Italy.[1]

Location

The pipeline runs from Lucera to San Paolo.

Project details

Main Line

  • Operator: Società Gasdotti Italia S.p.A[1]
  • Owner: Società Gasdotti Italia S.p.A[1]
  • Parent company:
  • Capacity:
  • Length: 69.0 km[2]
  • Diameter: 300.0 mm[3]
  • Status: construction[1]
  • StartYear1: 2025[1]
  • Cost: € 83.3 million
  • Financing:
  • Associated infrastructure:

Background

The pipeline first appeared in the ENTSOG TYNDP 2022 and reached FID status according to the 2024 TYNDP. It was reported that contruction would begin in January 2025 and be completed by December 2025.[1]

Articles and resources

References

{reflist}

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Ten Year Network Development Plan". ENTSOG. Retrieved 2025-08-26.
  2. "Info 7869". Ministero della Transizione Ecologica. Retrieved 2025-08-28.
  3. "Corinth Pipeworks was awarded two contracts for Società Gasdotti Italia (SGI) pipeline in South of Italy". Cenergy Holdings. 2023-10-31. Retrieved 2025-08-28.